G - OCCASIONAL MAINTENANCE
G1 - FUEL SYSTEM
BLEED
These operations are to be carried out only in the following cases:
• A component of the fuel system replaced.
• A drained tank.
• Running out of fuel.
Ensure that the level of fuel in the tank is sufficient and bleed in the following order:
- Open the I.C. engine bonnet.
- Put the ignition on for three minutes on the lift truck, to give the lift pump time to release
air from the filter.
- Switch off the ignition with the ignition key.
BLEEDING THE INJECTORS
- Remove the injectors cover 1 (fig. G1/1).
- Loosen high pressure connectors 2 (fig. G1/2) of all the injectors.
- Activate the starter until the diesel fuel flows out free of air at high pressure connectors
2 (fig. G1/2).
Do not engage the starter motor on a continual basis for more than 30 seconds and let it cool
between unsuccessful attempts.
- Tighten the connection while the diesel fuel is flowing out (tightening torque 22 ft/lb).
- The I.C. engine is then ready to be started up.
- Turn the I.C. engine over slowly for 5 minutes immediately after bleeding the fuel feed
circuit, in order to ensure that the injection pump has been bled thoroughly.
NOTE: If the I.C. engine functions correctly for a short time then stops or functions irregularly, check for possible leaks in the low
pressure circuit. If in doubt, contact your dealer.
G2 - WHEEL
CHANGE
In the event of a wheel being changed on the public highway, make sure of the following points:
For this operation, we advise you to use an approved hydraulic jack and safety support.
- Stop the lift truck, if possible on even and hard ground.
- To pass on stop of lift truck (see: 1 - OPERATING AND SAFETY INSTRUCTIONS: DRIVING
INSTRUCTIONS UNLADEN AND LADEN).
- Put the warning lights on.
- Immobilise the lift truck in both directions on the axle opposite to the wheel to be
changed.
- Unlock the nuts of the wheel to be changed.
- Place the jack under the flared axle tube, as near as possible to the wheel and adjust the
jack (fig. G2/1).
- Lift the wheel until it comes off the ground and put in place the safety support under the
axle (fig. G2/2).
- Completely unscrew the wheel nuts and remove them.
- Free the wheel by reciprocating movements and roll it to the side.
- Slip the new wheel on the wheel hub.
- Refit the nuts by hand, if necessary grease them.
- Remove the safety support and lower the lift truck with the jack.
- Tighten the wheel nuts with a torque wrench (see: 3 - MAINTENANCE: A - DAILY OR EVERY
10 HOURS SERVICE for tightening torque).
G2/1
G2/2
G1/1
G1/2
2
2
2
2
1
3 - 38
Содержание MT 732
Страница 2: ......
Страница 4: ......
Страница 5: ...ROUGH TERRAIN FORKLIFT TRUCK GENERAL SAFETY STANDARDS I...
Страница 22: ......
Страница 23: ...1 1 1 1 OPERATING OPERATING AND SAFETY AND SAFETY INSTRUCTIONS INSTRUCTIONS...
Страница 24: ...1 2...
Страница 44: ...1 22...
Страница 45: ...2 1 2 DESCRIPTION 2 DESCRIPTION...
Страница 46: ...2 2...
Страница 55: ...2 11...
Страница 86: ...2 42...
Страница 87: ...3 1 3 MAINTENANCE 3 MAINTENANCE...
Страница 88: ...3 2...
Страница 99: ...3 13...
Страница 109: ...3 23...
Страница 115: ...3 29...
Страница 121: ...3 35...
Страница 123: ...3 37...
Страница 129: ...4 1 4 4 PICKING UP PICKING UP THE THE ATTACHMENTS ATTACHMENTS...
Страница 130: ...4 2...
Страница 132: ...4 4...
Страница 138: ...4 10...