18
●
They're designed for installation in smoke and heat removal duct according to EN1366-8.
●
They're suitable for installation in a vertical position, with the blade axis horizontal.
●
Dampers and duct must be suspended separately. The connected ducting must be supported in such
a way that the transfer of all loads from the adjoining ventilation duct to the damper body is completely
excluded. Adjacent duct must be suspended or supported, as required by the duct suppliers.
●
o provide the necessary space for access to the control device, it is recommended that other objects
be at least 350 mm away from the control parts of the damper.
●
Transport the damper to the installation site in the transport packaging. Pay attention to the appropriate
length of the forks of the forklift /handling equipment/ to avoid breaking of wooden planks, consequently
damaging the damper´s blades.
●
Smaller dimensions can be transported, handled and installed into the builders work opening manually,
for dimensions where a handling insert is included in the delivery, it is recommended to use a suitable
handling tools and machines, e.g. a forklift.
Position:
1
Damper housing
2
Blade stop
3
Handling inserts (2pc)*
4
Blades
5
Board - not included**
6
Forks
* Included in package of larger dimensions SEDM-L.
** Construction board thickness min. 25 mm.
Содержание SEDM-L
Страница 1: ......
Страница 12: ...12 Dimensions...
Страница 13: ...13 A A 30 A B 17 10 10 X A A Detail X Detail Y B B B B Y...
Страница 14: ...14...
Страница 19: ...19...
Страница 20: ...20 X Detail X Position 1 SEDM L 2 Flange Detail X Detail Y Detail Y Y...
Страница 24: ...24...
Страница 25: ...25 100 Mortar or gypsum EIS 90 26 100 Ablative Coated Batt EIS 120 27 100 Ablative Coated Batt EIS 120 28...