17
TPM 092/13
Position:
1
Fire damper FDMD
2
Mortar or gypsum with min. density 800 kg/m or another
approved fire sealing system for damper installation
3
Duct
1
2
Fig. 32 Installation in a solid ceiling construction
Position:
1
Fire damper FDMD
2
Stuffing box (mineral stone wool min.
density 140 kg/m ) or another
approved fire sealing system for
damper installation
3
Fire protection mastic Promastop
P,K or equal min. thickness 1 mm
4
Duct
Used materials - example*:
2
Promapyr, Rockwool Steprock HD
3
Promastop - P, K
* Stuffing box and fire protection mastic
materials can be replaced by another
approved fire sealing system for
damper installation with equivalent
material properties
3
1
Min. 50
2
Fig. 33 Installation in a solid ceiling construction
Position:
1
Fire damper FDMD
2
Fire resistant board
3
Fire stop coating thickness 1 mm
4
Duct
Used materials - example:
2
Hilti CP673 PF
3
Hilti CP673
3
2
3
4
4
3
3
Fig. 31 Installation in a solid ceiling construction
1
EIS 120
EIS 90
EIS 90
EIS 90