55
TPM 075/09
6.5. Installation in a solid wall construction near the ceiling or wall. Gap is filled by gypsum or mortar
and mineral stone wool
POSITION:
1
FDMB
2
FDMB with installation frame R1, R2
3
FDMB with installation frame R3, R4
4
FDMB with installation frame R5
5
Gypsum or morter
6
Mineral stone wool, min. density 140 kg/m
7
Holder
8
Holder L
9
Fitting with threaded rods or steel brackets
3
6 2 5
6 2 5
7
8
≤
40
≤
40
≤
4
0
2
6
≤
40
20
≤
D+220
≤
D
+
22
0
6 3
7
6 3
7
≥
50
≤
10
≤
D+220
6 1 5
5
≤
50
≤
50
6 1
≤
5
0
6
5
1
≤
B+100
≤
H
+
10
0
≤
50
6
1 5
5 1
6
From 10 to 50
F
ro
m
1
0
to
5
0
6
D-20
≤
D
+
10
0
5
D
-2
0
1
4
9
4
9
≥
10
≥
20
≥
1
0
≥
1
0
≥
2
0
Fig. 68
Installation in a solid wall construction
EIS 90
Содержание FDMB
Страница 1: ......