Ref.: WB-VL-SM Ver.1 3.doc
43
5.8.
LASER BEAM
1.
Open the Laser/ Torch cover by removing the screws.
2.
Take out the Laser from housing and then by removing the grub screws.
3.
Remove the Laser cable by disconnecting the Torch connector CN8 (3Pin SR)
from I/F Board. Take out the cable through the hole in cabinet.
4.
Replace the Laser.
5.
Reconnect the connector.
6.
Check the Laser function
7.
Align the Laser line parallel to main shaft by marking a line on floor with reference
to main shaft centre line. Use the pendulum with rope( refer image) to Mark three
dot points at 150mm interval along the parallel of shaft and draw a straight line
joining the three dot points.
Fig. 97
5.9.
STICKER WEIGHT HOLDER
1.
Remove the Nylock from the DMR lever and take out the Sticker weight holder
2.
Re-fix the new Sticker weight holder with the DMR Lever and lock it using Nylock
nut so that the Holder movement is not arrested completely.
Fig. 98
Содержание LX WB-VL-65 DSP
Страница 48: ...Ref WB VL SM Ver 1 3 doc 45 7 DIAGRAMS 7 1 BLOCK DIAGRAM 7 1 1 LCV MODELS Fig 99...
Страница 49: ...Ref WB VL SM Ver 1 3 doc 46 7 1 2 HCV MODEL THREE PHASE OPERATION Fig 100...
Страница 50: ...Ref WB VL SM Ver 1 3 doc 47 SINGLE PHASE OPERATION Fig 101...
Страница 51: ...Ref WB VL SM Ver 1 3 doc 48 7 2 WIRING DIAGRAM 7 2 1 LCV MODELS Fig 102 1 of 3...
Страница 52: ...Ref WB VL SM Ver 1 3 doc 49 Fig 102 2 of 3...
Страница 53: ...Ref WB VL SM Ver 1 3 doc 50 Fig 102 3 of 3...
Страница 54: ...Ref WB VL SM Ver 1 3 doc 51 7 2 2 HCV MODEL THREE PHASE OPERATION Fig 103 1 of 3...
Страница 55: ...Ref WB VL SM Ver 1 3 doc 52 Fig 103 2 of 3...
Страница 56: ...Ref WB VL SM Ver 1 3 doc 53 SINGLE PHASE OPERATION Fig 103 3 of 3...