Ref.: WB-VL-SM Ver.1 3.doc
38
2.
Take out the Revolution Index encoder board from Rotor.
3.
Fix the new board with Rotor by matching the slot in the Round segment
encoder. Do not touch the Encoder.
4.
Connect 10Pin FRC cable with Revolution index encoder board.
5.
Switch ON the Balancer. Run Wheel Tracking test (Ref. Chapter 4.4) &
Duty cycle test (Ref. Chapter 4.9) to ensure the functions are OK.
6.
Calibrate the Balancer as explained in Operating manual.
7.
Run the Balancing program and ensure the functions are working
properly without any errors.
5.2.3.
PIEZO ELECTRIC SENSOR
1.
Remove the Top cover
2.
Remove the Brake shoe lever
3.
Disconnect the connection to Revolution encoder
4.
Remove the belt. Remove the Driven pulley
5.
Disconnect the Sensor connector from Board
6.
Loosen the lock nuts of SA and SB sensors.
7.
Loosen out the sensor stud nuts and take out the studs.
8.
Take out the sensors
9.
Replace new sensor. (-) side of sensor should be facing the
cabinet.
10. Vertical is B sensor and horizontal side is A sensor.
11. The washers should be used as shown in picture.
12. Fix the stud to the rotor. The other side of stud nut to be fitted to
cabinet. Ensure the stud is in centre of slot.
13. Before tightening, use a dial with stand at the location as given in
picture . Refer first picture for SA and second one for SB.
14. Tighten the top side nut so as the dial reading moves upto 0.2
mm. After that, tighten the opposite side so as the dial comes back
to 0 again.
15. Tighten both sensor nuts similar way.
16. Refix the driven pulley and also the Rev. Encoder
17. Connect the FRC connector (10 pin) to Rev.encoder and connect
sensor connector in Board.
18. Refix the brake.
19. Refix the belt. Do the weight calibration and check the balancing.
Содержание LX WB-VL-65 DSP
Страница 48: ...Ref WB VL SM Ver 1 3 doc 45 7 DIAGRAMS 7 1 BLOCK DIAGRAM 7 1 1 LCV MODELS Fig 99...
Страница 49: ...Ref WB VL SM Ver 1 3 doc 46 7 1 2 HCV MODEL THREE PHASE OPERATION Fig 100...
Страница 50: ...Ref WB VL SM Ver 1 3 doc 47 SINGLE PHASE OPERATION Fig 101...
Страница 51: ...Ref WB VL SM Ver 1 3 doc 48 7 2 WIRING DIAGRAM 7 2 1 LCV MODELS Fig 102 1 of 3...
Страница 52: ...Ref WB VL SM Ver 1 3 doc 49 Fig 102 2 of 3...
Страница 53: ...Ref WB VL SM Ver 1 3 doc 50 Fig 102 3 of 3...
Страница 54: ...Ref WB VL SM Ver 1 3 doc 51 7 2 2 HCV MODEL THREE PHASE OPERATION Fig 103 1 of 3...
Страница 55: ...Ref WB VL SM Ver 1 3 doc 52 Fig 103 2 of 3...
Страница 56: ...Ref WB VL SM Ver 1 3 doc 53 SINGLE PHASE OPERATION Fig 103 3 of 3...