Bedpan / Urinal Bottle and Utensil / Bowl Washer Disinfector (WDS)
Operation, Maintenance and Installation Manual
Issue 16
Page
8
August 22
2.0
Installation and Commissioning
2.1
Installation
To avoid problems with this device, these Installation Guidelines should be followed.
Installations must be carried out by a qualified and licenced tradesperson.
The device must be affixed to the building structure to ensure mechanical stability prior to use. The device
can be affixed to the building structure via the holes provided in the device feet, or use of an appropriately
rated appliance safety strap.
Prior to installation of the device, services as noted are to be provided by the facility. It is not the
responsibility of Malmet to provide these service connections.
Risk Assessment
It is recommended a risk assessment is conducted by the user both prior to and after installation and any risks identified
mitigated to an acceptable level using the hierarchy of control;
https://commons.wikimedia.org/w/index.php?curid=55610678
Handling
Weights of Device:
Net: 140 kg
Shipping: 158 kg
Shipping with crating: 217 kg.
•
Handling of the device to installation site must be with fork lift or hand pallet truck.
•
Before unpacking device inspect carton for any damage relating to forklift forks and damage relating to device falling
over or for evidence of top loading
•
After unpacking the device, inspect all external panels for damage.
•
Remove the 4 screws holding the device to the pallet.
•
Follow your internal manual handling guidelines to manoeuvre the device off the pallet. The device can then be placed
into position by fork lift or hand pallet truck.
Disposal of Packaging
•
Please dispose of packaging as per facility procedures or local government requirements.