
P
9
/ 2
9
R
epair
[3] -1. Motor section
ASSEMBLING
Fig. 7
(36)
(36)
(4) Set Lead wires and electrical parts to Separator before mounting cowling complete.
Fig. 7
(65)
Heat sink
Do not put any lead wires
on Heat sink.
Put lead wires in this place
so that they do not come
out to the outside of
Spacer (34).
Screw boss
Put lead wires of Power
supply cord (36) so deep
that they are not put on
Screw boss.
Be careful not to put lead wires on Screw boss,
Terminal and Ribs for Terminal setting.
Screw boss
Terminal
Terminal
Controller C (65) has to be put
exactly to the place where it is.
(34)
(34)
(18)
(18)
Fix Lead wires (red) with two lead wire holders
of Switch base complete (18). Otherwise, they
can be damaged by the rib of Cowling complete.