
P 1
4
/ 2
9
R
epair
DISASSEMBLING
Fig. 14
Fig. 15
(3) Component parts of Switch base section are as shown in
Fig. 14
.
Assemble Stopper to Straight pipe at the illustrated position.
Fig. 15
[3] -3. Switch base section
ASSEMBLING
[3] -4. Straight pipe and Stopper
[3] DISASSEMBLY/ASSEMBLY
10
10
(10) 4x18 Tapping screw 2 pcs.
(11) Switch holder
(13) Switch
(14) Stop ring E-12
(15) LED Circuit
(16) Sub controller
(17) Stop ring E-7
(18) Switch base complete
(19) O ring 14
(20) Switch lever
(21) O ring 9
(22) Switch dial
11
13
14
15
16
17
18
19
20
21
Straight pipe
Stopper
125~135mm
Note
: Put on Makita grease FA No.2 a little on the circumference
of O ring 14 (19) and O ring 9 (22) when assembling.
22