1.1 BUILDING THE FRAME
TOOLS NEEDED:
Saw
Power Drill
Screwdrivers
Safety goggles
BUILD TIME:
About 5 hours, plus
glue drying time
COST:
Approximately $90
CUT LIST:
2x4s
(1)120”
(1) 88”
(2) 82”
(2) 79”
(2) 60”
(2) 34”
(2) 30”
(2) 28”
(2) 7”
(4)3.5”
MATERIALS LIST:
(7) 10’ long 2x4s
(1) 8’ long 2x4
(1) 6’ long 2x4
(1) 4X8 sheet .75” plywood
(75-100) 2.25” wood screws
Wood glue
Hardware & parts from kit
Note: Lumber dimensions are not critical, if 2x4s are not available in your area the local
equivalent will work. When cutting, try to keep the ends as square as possible, but small
errors in the lengths of any of the parts will not affect accuracy of the machine.
DESIGN BY THE MASLOW COMMUNITY, PARTICULARLY USERS DLANG AND MADGRIZZLE
Precision Level
Difficulty Level
THIS WORK IS LICENSED UNDER THE CREATIVE COMMONS ATTRIBUTION-SHAREALIKE 4.0 INTERNATIONAL LICENSE.
BEFORE BEGINNING
Acquaint yourself with
standard practices for
workshop safety.