BOXER SERIES 80-120 KVA
PRODUCT DESCRIPTION
AG-SD-37/ Publication Date: 19.10.2012/Rev. No:1/Rev. Date:16.11.2012
18
Battery tests are performed by directing the power to
the mains, independently from the loads. If the mains
values gets out of limits during the test, test is
cancelled.
Following
Status> Battery
menu, how many minutes left to start the test can be observed.
If “
Stop Battery Test
” is chosen from the menu, the UPS cancels the battery test and goes back
to the previous operating state.
2.4.6 Status Menu
You can see information about the mains, output,
bypass line, battery, temperatures, inverter, alarms
and device information on this menu.
Mains
UP, F, I, UL
Frequency, current and voltage (phase-neutral) of each phase.
S, P, PF
Apparent power, active power and power factor of each phase.
Output
UP, F, I,UL
Frequency, current and voltage (phase-neutral) of each phase.
S, P, PF
Apparent power, active power and power factor of each phase.
L,CF
Load as percentage and crest factor of each phase.
Bypass
UP, F, I,UL
Frequency, current and voltage (phase-neutral) of each phase.
Battery
Mode
Operation Mode of the device.
U, I,
°
C
charging voltage, current and temperature.
Charge%
Charge percentage.
Autonomy Time
remaining back-up (autonomy) time