Make Noise Rene Скачать руководство пользователя страница 12

Musically speaking, Seek moves more, and Sleep will rest more. Using Sleep and ProGraMming Access

and Gates, it is possible to create rests, pauses and etc...

LOGIC OPERATIONS

There are 3 rows of the logic processing. CLK by MOD, Gate by MOD and Gate by Opposing CLK.

With the Clock Logic Ops (locations 9, 10, 11) the MOD input is AND, OR, XOR against the CLocK and the

result drives the counter for the associated Axis.

With the Gate Logic Ops (locations 5, 6, 7) the MOD is AND, OR, XOR against the CLocK and the result

drives the gate programming logic (X Gate or Y Gate pages). The LAST part of the chain is the GATE ON/

OFF, thus giving Gate ProGraMming top level control in the grand scheme of René. When you want a

particular location to NOT generate an event, you turn off the Gate and there will be NO event.

Truth Tables:

(NOTE: 0 = FALSE = OFF, 1 = TRUE = ON)

For CLK by MOD logic operations the results apply to both the movement of the sequence and the

associated gate outputs. For Gate by MOD logic operations the results apply only to the associated gates

outputs. It is easy to experiment with different logic operations, so do not be shy. In some cases the

results are wonderfully jumbled, while in others, they are barely noticeable. One parameter that has a

great deal of bearing on the outcome of these logic processes is Gate Width of the incoming CLocK and

MOD signals.

A

B

AND

AB

A

B

Out

0

1

0

0

0

0

1

0

0

1

1

1

A

B

OR

AB

A

B

Out

0

1

0

0

0

1

1

0

1

1

1

1

A

B

XOR

AB

A

B

Out

0

1

0

0

0

1

1

0

1

1

0

1

Содержание Rene

Страница 1: ...Ren v 2 2...

Страница 2: ...ate the equipment This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable p...

Страница 3: ...cost to Make Noise Please contact technical makenoisemusic com for Return To Manufacturer Authorization Make Noise implies and accepts no responsibility for harm to person or apparatus caused through...

Страница 4: ...rack synthesizer case confirm proper installation of included eurorack bus board connector cable on backside of module see picture below plug the bus board connector cable into the Eurorack style bus...

Страница 5: ...e the path taken through those steps is for all practical purposes infinite In fact Ren does not step at all but rather it maps coordinates to locations in a grid and because if this it is possible to...

Страница 6: ...t of coordinates X CV is normalled to 5V so that with nothing patched the attenuator acts as offset generator 4 X CV Input CV Attenuator 5 Y CLK Input Clock Gate signal of width greater then 5ms and a...

Страница 7: ...utput reflects the ProGraMming on the X Gate Page When Ren arrives at a location and the location is set to ON lighted at the X Gate PGM Page this output goes HI for duration determined by the XCLK wi...

Страница 8: ...aM Page PRESS to return to Play Mode While in Play Mode PRESS to latch currently held Locations 20 Touch Grid Used to select Locations for ProGraMming and latching Indicators 15 G Y LED FLASHES to ind...

Страница 9: ...last selected PGM Page PGM 2 While PLAYing this Touch Plate is used to Latch Unlatch the steps held by the performer using the 4x4 Touch Grid Once within the PGM Pages the PGM2 touch is used to EXIT t...

Страница 10: ...rn to certain Locations X Gate The performer may select deselect which Locations in the 4x4 Touch Grid will generate a gate at the G X Output Y Gate The performer may select deselect which Locations i...

Страница 11: ...or TOUCH ACCESS and both X and YAxis are Reset then Ren will be forced to stop since it has been Reset to a Location where there is no path out In Snake Mode a pulse at the X MOD input will reset to t...

Страница 12: ...p level control in the grand scheme of Ren When you want a particular location to NOT generate an event you turn off the Gate and there will be NO event Truth Tables NOTE 0 FALSE OFF 1 TRUE ON For CLK...

Страница 13: ...tored Quantized Voltages set touch the location of the active set thus toggling the SQV to OFF With the scale AND the Voltages you have programmed stored you effectively have two channels of Control V...

Страница 14: ...APPENDIX C Snake Memorized Coordinate Sets These drawings illustrate the SNAKE like paths that Ren travels reading coordinates from memory Conceived and Illustrated by yerpa58...

Страница 15: ...it uses the COMBINATION of the signals at the X CLK and X MOD inputs to create new behaviors On the X FUN page activate Location 9 AND This is AND for the clock Keep the clock patched to the X Clock...

Страница 16: ...ar at the G X Output Notice even when the Rene advances to the next X Axis Location no Gate appears at G X until there is positive signal present in the X MOD input as well Therefore with a combinatio...

Страница 17: ...wly up from 0 in order to gradually destabilize the sequence Variation 1 Turn Fold CCW and patch one of Rene s Gate Outputs to the DPO s STRIKE Input Toggled Sequencing Concept No Sound as Depicted Ad...

Страница 18: ...le Variation Patch MATHS EOC Output to Rene Y CLK Input in order to switch snake patterns aftern each MATHS Function Envelope cycle Concept Arpeggiation of a 4 step Sequence No Sound as Depicted For b...

Страница 19: ...r patterns await discovery A cluster of higher CV values will cause extended sudden movement Eddies can be created by setting several adjacent knobs to low values Different clock sources in the X and...

Отзывы: