24
73D4126
DVKST Series Gas Fireplace
To Junction Box
In Fireplace
White
Black
White
Black
Black
White
Green
Connector
Pin To Control Box
AC Module
{
{
Light
Rear
Burner
Solenoid
Control Box
Blower
Right
Blower
Left
Black
Black
FP1915
AC box wiring
8/08
SIGnaTure coMManD - opTIonal Fan Blower SySTeM
opTIonal Fan/Blower SySTeM
(BloTKSTSc)
IMporTanT: always check local building codes.
This installation must comply with local regulations
as well as the national electric code.
wIrInG
1. Before installing the blower, wire the receptacle into an
electrical circuit. This should be done before framing the
fireplace. Wire with minimum 60° C wire in accordance
with prevailing codes.
2. Remove the external junction box cover by removing
the screw from the right side of the outside firebox wall.
Junction box was installed at the factory.
3. The junction box cover has a factory installed “romex”
style strain relief connector. After connecting the wires,
route the wire leads through this connector. Refer to the
wiring diagram in
Figure 28.
FP1912
Junction box wiring
8/08
120V AC
60Hz
Factory Supplied
Not Supplied
junction Box
Figure 27 -
Junction Box Wiring Diagram
w
arn
In
G
Before installing the blower, turn off the fireplace and
allow to cool. Only a qualified service person should
service and repair the fireplace. A qualified service
person should connect and disconnect the fireplace
to gas supply. Follow all local codes.
Figure 28 -
Blower Wiring Diagram
(shown with 2 blowers)
FP1915
w
a
rn
In
G
Electrical Grounding Instructions: This appliance is
equipped with a three-prong (grounding) plug for
your protection against shock hazard and should
be plugged directly into a properly grounded three
prong receptacle.
Содержание 500DVKST
Страница 48: ...48 73D4126 DVKST Series Gas Fireplace...
Страница 49: ...73D4126 49 DVKST Series Gas Fireplace...