Majestic fireplaces UV36RN Скачать руководство пользователя страница 9

9

UV36RN/RP Vent-Free Gas Fireplaces

20007436

10"

8"

6"

1"

9"

Min.

 T107

Mantel clearance

with canopy

10/27/03   djt

12"

Min.

18" 

Min.

22"

Min.

Heat Resistant 

Material

AH3342 

Adjustable 

Canopy

T107

Fig. 5b

  Minimum clearances with AH3342 canopy.

T107

side clearance

and projection

10/27/03  djt

Fireplace 

Opening

Combustible Mantel

Noncombustible 

Facing

Mantel Leg

Mantel Leg

2” Min. 

Clearance

Max. Projec-

tion 7”

T108

Fig. 6

  Side clearance and projection.

This list of specific instructions will help you make 
certain that every installation operation is done 
correctly.  Complete the installation steps in the 
sequence shown.

LOCAL BUILDING CODES SHOULD BE CONSULTED 
IN ALL CASES AS TO THE PARTICULAR REQUIRE-
MENTS CONCERNING THE INSTALLATION OF FAC-
TORY BUILT VENT FREE FIREPLACES.
Select the location for the fireplace by taking into con-
sideration the factors previously outlined in the Planning 
Ahead section of this manual.

Step 1:  Framing the Firebox

The entire fireplace can be elevated above the floor to 
achieve a raised hearth effect.  This can be done by 
adding a small platform to achieve the desired height.

STOP!  INSTALL CANOPY AT THIS TIME BY LOOS-
ENING THE SCREWS LOCATED AT THE TOP 
FRONT OF THE FIREPLACE.  NEXT,  SLIDE THE 
SLOTTED FLANGE OF THE CANOPY UNDER THE 
LOOSENED SCREWS, THEN RETIGHTEN THE 
SCREWS TO SECURE THE CANOPY. 

(Fig. 5a)

Step 2:  Install the Firebox

Install the firebox into the framed opening by setting 
it directly in front of the opening and sliding it into the 
proper position.

Step 3:  Level the Firebox

Check the level of the firebox on the top edge of the 
fireplace face.  Shim if necessary.

Step 4:  Secure the Firebox

Secure the fireplace to the framing.  The nailing flanges 
on the firebox will make securing the firebox to the 
frame quick and easy.  Use appropriate size nails or 
screws to secure the firebox.

Step 5:  Removing the Front Screen Panel 

To remove the screen panel, first open the control 
panel door.  Using a 1/4” nut driver, remove the two 
screws that secure the screen panel to the front of the 
fireplace, (Refer to Figure 7 for the location).  Carefully 
pull the bottom of the screen panel out toward you, then 
pull the panel down until the two pins at the top of the 
screen panel clears the holes in the top of the fireplace.  
Reverse the above operation to reinstall the screen 
panel.

WARNING: The front screen on the fixed screen 
models must be installed before the fireplace is 
put into operation.

T145

front screen panel

11/4/03  djt

Pins Securing Top of 

Screen Panel

Screws Securing Bottom of 

Screen Panel  

(Control Panel Door is Open)

T145

Fig. 7

  To remove screen panel, remove two screws securing 

screen, then pull panel down until top pins clear holes in top 
of fireplace.

Содержание UV36RN

Страница 1: ...use any phone in your building Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas sup plier call the re department Installa...

Страница 2: ...rts 19 Warranty 21 This book contains your operating and installation instructions and should be kept in a safe place For you to realize all the advantages and use of the reliable service that has bee...

Страница 3: ...r ammable material on or near the appliance This appliance must only be used with pressures at the inlet as shown in Table 1 Page 11 in installation instructions The installation must conform with loc...

Страница 4: ...epth 7436 UV36RN rp Specs 11 4 03 djt 35 33 1 2 3 7 8 11 8 Outside Air Access Gas Line Access Not used on this model Gas Line Access 3 7 8 8 Gas Line Electrical Access Gas Line Access Not used on this...

Страница 5: ...pliances in the space Gas range_________________ BTU Hr Vented gas heater __________ BTU Hr Gas replace logs___________ BTU Hr Other gas appliances _____ BTU Hr Total _____ BTU Hr Example Gas range 60...

Страница 6: ...oors or spaces open to the outdoors These spaces include attics and crawl spaces Follow the National Fuel Gas Code NFPA 54 ANSI Z223 1 Section 5 3 Air for Combustion and Ventilation for required size...

Страница 7: ...full outer casing and full bottom pan use Blower Kit BL 4 or FK12 If the construction of your replace is with two sheet metal legs supporting the combustion chamber at the back use Blower Kit BL 3 Th...

Страница 8: ...st boards etc is 9 Combustible material projecting 6 a mantel shelf for example requires a minimum clearance of 12 above the replace opening Required clearance varies with the amount of projection Fig...

Страница 9: ...F THE CANOPY UNDER THE LOOSENED SCREWS THEN RETIGHTEN THE SCREWS TO SECURE THE CANOPY Fig 5a Step 2 Install the Firebox Install the rebox into the framed opening by setting it directly in front of the...

Страница 10: ...ater s rating plate If the gas type indicated on the plate is not your type of gas supply DO NOT INSTALL Contact your dealer for proper model Gas Piping The gas supply line must be of an ad equate siz...

Страница 11: ...determine the size of the branch gas line from the main gas line to the replace enter the tables below for iron pipe or copper tubing using the distance from the gas meter or second stage regulator t...

Страница 12: ...nly on top of the front burner port area Equally space embers one layer thick Do not pile ember material over one layer thick as this does not enhance the ember appearance or improve the log set perfo...

Страница 13: ...B B A T148 attach wires 11 5 03 djt A Existing valve wiring Do not tamper with B Remote receiver wires red or white on either side Fig 12 Attach receiver wires to outer two terminals on valve Installa...

Страница 14: ...tructions 1 STOP Read the safety information above before proceed ing 2 Refer to Figure 16 To turn off the gas supply depress the knob slightly and turn clockwise to the OFF position 3 Wait ve 5 minut...

Страница 15: ...hutter Settings Model A UV36RN 0 125 UV36RP 0 375 T134 Fig 23 Air shutter settings Finishing the Fireplace There are a wide variety of nishing materials avail able for your replace from formal wall tr...

Страница 16: ...d combination of ame aesthetics and heat output Fig 24 Finishing options T146 finishing 11 5 03 djt Wallboard with Marble Slate or Tile Facing Brick or Stone Facing Wallboard with Facing and Mantel Fi...

Страница 17: ...acuum cleaner to carefully remove dust and loose par ticles from the base logs and from around the burner Gloves are recommended when handling the logs Use extreme caution when cleaning around the pil...

Страница 18: ...clogged Clean burner ori ce Control knob not in ON position Turn control knob to ON position 4 Heater shuts off on ODS Not enough fresh air is available Open window Low gas pressure Contact your gas s...

Страница 19: ...s at any time without notice 7436 UV36RN UV36RP Ref Description UV36RN UV36RP 1 Grate Assembly 78442 78442 2 Side De ector 78443 78443 3 Support Channel 78439 78439 4 Air Scoop 78445 78445 5a Valve Na...

Страница 20: ...78596 78596 14 Mini Rocker Switch PCOA049 PCOA049 15 Knob Extension On Off 3 77958 77958 16 Knob Extension Hi Lo 3 77959 77959 17 Embers Platinum Bag 78037 78037 18 Lava Gravel Assy 68688 68688 19 Log...

Страница 21: ...21 UV36RN RP Vent Free Gas Fireplaces 20007436...

Страница 22: ...22 UV36RN RP Vent Free Gas Fireplaces 20007436...

Страница 23: ...ction the damage is found to be the fault of the manufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of this...

Страница 24: ...2695 Meadowvale Blvd Mississauga Ontario Canada L5N 8A3 800 668 5323 www cfmcorp com CFM Corporation...

Отзывы: