31
Kleiss MCS60-38 System Manual v.15 May 2020
|
www.MainlineControlSystems.com
Install safety fitting on inflation pressure port.
Allow the stopper to stabilize inside the pipeline
for at least 10 minutes.
Evacuate or purge pipeline work area. Use the by-
pass / vent port on tower and vent stack, if desired.
(Do this in accordance with your gas company
procedures.)
by-pass / vent port
Verify inflation pressure and system pressure
remains stable.
You may now start your work on the pipeline.
NOTE: Continue to monitor gauges on stopping
towers.