28
Kleiss MCS60-38 System Manual v.15 May 2020
|
www.MainlineControlSystems.com
Close the valve of the by-pass / vent port.
Open the ball valve and check for any leaks in the
stopping tower. Use leak soap if necessary.
Correct any blow-by or leaks before continuing
stopping operation.
Locate the proper height indication on the rods of
the tower. (These indications identify the position
of the chute inside the pipeline based on the size
of the pipe.)
NOTE: The left rod shows indications for cast
iron, polyethylene, and PVC pipelines. The right
rod shows indications for steel pipelines.
Control the crank handle on the gear assembly and
unlock the gear assembly.
Using the crank handle, lower the gear box down
until appropriate height indicator on rod is visible
on top of the gear box. (This lowers the chute into
the pipeline.)