31
© Baxi Heating UK Ltd 2011
10.6
Fitting the Flue (Cont)
CONCENTRIC VERTICAL FLUE
15. Once the length of the vertical concentric extension has
been determined mark and carefully cut off the excess
material. The cut end MUST be square and free of burrs to
ensure correct insertion into the boiler adaptor.
16. Measure 25mm from the end of the flue extension and
apply a length of tape around the outer duct (Fig. 53).
17. Engage the extension into the adaptor up to this
position (Fig. 54). Once the installation of the flue is
complete and all support brackets are securely in place
remove the tape.
Adaptor
Apply Lubricant for
ease of assembly.
Ensure Extension is
fully engaged into
Boiler Adaptor
25mm
Extension
Cut End
Fig. 53
Tape
10.0 Installation
Fig. 54
Supplied by HeatingSpares247.com