10. Mounting information │ UK
15
●
The technology used in the phase angle
controller may cause humming noises. To
use a frequency converter, contact the
manufacturer.
●
The fan is speed controllable. Speed
control wiring diagram on request from the
manufacturer.
11. Mounting
When transporting and installing,
proceed with caution so that the fan
unit does not unlatch.
1. Switch off mains fuse, secure against
being accidentally switched back on and
position a visible warning sign. Comply
with the 5 safety regulations.
2. Remove the unit from the transport box
and set it down. Recommendation: Set the
fan down on the inner box ribs with the
protective cage facing downwards.
3.
Set swivelling angle
(factory setting 90°).
To change the factory setting, slightly
widen the bearing bracket [5], remove it
from the bearing bushing [8] on the right
and left and remove the pin from the
eccentric lever.
Remove eccentric lever. To do so, remove
the retaining ring [12.1], pull out the pin
[12] and insert and secure it in the desired
position. For 55°, 70° or 115° positions
Fig. B.
Mount bearing bracket [5]: Carefully widen
it and insert it in both bushings. Do not yet
plug in the pin of the eccentric lever [12].
4. Remove cover [3] according to Fig. D: As
necessary, slightly lift each side with a
screwdriver so that the four latching
corners unlatch. Remove cover
Fig. E.
5. ECO 40 D: Pull the capacitor [15] off of the
bearing bracket
Fig. F.
6. With electric recessed-mounted
connection “UP”
Fig. D: Break out cable
feedthrough on the bearing bracket and
stick the power cable through this
feedthrough in the bearing bracket.
7. Mark the drill holes (distance 70 mm)
Fig. G, insert dowel (min. Ø 8 mm) and
screw the bearing bracket to the wall.
Cover screw heads with the supplied
plastic caps.
8. Screw the terminal block to the holder [16]
with the supplied screws (M3x12).
9. ECO 40 D: Insert the capacitor [15] into
the bearing bracket
Fig. F.
10. With electric surface-mounted
connection “AP”
Fig. H: Guide the power cable through
the cable grommet [4] in such a way that
the cable grommet fits around the cable
sheathing completely. If necessary, seal
the cable grommet on-site. In the case of
a vertically positioned swivel axis, it is
recommended to face the cable entry
downwards.
11. Perform the electrical connection in
accordance with the following wiring
diagrams. Wiring diagram for speed
control on request.
ECO 30 E ECO 40 D
12. Insert the cover [3] on the bearing
bracket such that it audibly latches at the
four corners. Ensure correct seating of
the cable grommet [4]
Fig. I.
13. Carefully swivel the fan unit towards the
middle and insert the pin of the eccentric
lever [12]. Ensure the correct position of
the bearing bushing. The job is done!
12. Commissioning
1. Pay special attention to the safety
instructions and warnings in Chapter 4.
Содержание ECO 30 E
Страница 2: ...2 A B C ...
Страница 3: ...3 D E F G H I ...