background image

 

 

 

 

10

 Check that cable grommet [3] is positioned 

correctly. 

 Secure housing [1] to wall or ceiling with 

screws, see section 7. 
AE 10: 2 screws 
AE 16: 4 screws 
Use mounting material of a sufficient size. 

 

8.1 Electrical connection 

 

DANGER 

Danger to life from electric 
shock 

 Switch the mains fuse off. 

NOTICE

 

Unit damage in the case of 
short-circuits 

 Insulate PE conductor and 

unneeded cable cores. 

 Strip cables and connect to connecting 

terminal [5] as shown in wiring diagram. 

 
 
 
 
 
 
 
 
 
 
 

 Put the terminal block cover [8] on and 

screw it into place. 

 

8.2 Start-up 

 Switch the mains fuse on. 

 Carry out a function test. 

 
 
 
 
 

8.3 Lamella opening and closing 
angle 

Use setting screws [2] and [9] to 
define how far the lamella close  
(basic ventilation) or open (maximum 
ventilation). For positioning, see Fig. 
A, scale [10] and position "X" of the 
following characteristic curves. 

 Use setting screw [9] to set opening angle 

of lamella.  

Do not insert setting screw [9] too far 
otherwise it will fall into the housing. 

 Use setting screw [2] to set closing angle of 

lamella. 

 

Characteristic curves for AE 10 

 

X = lamella opening or closing angle 
 

Characteristic curves for AE 16 

 

X = lamella opening or closing angle 

i

i

GB 

Содержание AE 10

Страница 1: ...ktrisch Internal shutter electrical Volet de fermeture int rieur lectrique AE 10 AE 16 Montage und Betriebsanleitung Mounting and Operating instructions Instructions de montage et Mode d emploi www m...

Страница 2: ...onen und Tipps Aufz hlungssymbol Liste mit wichtigen Informatio nen zum jeweiligen Thema Handlungssymbol Liste mit durchzuf hrenden T tigkeiten F hren Sie die angegebenen Anweisungen der Reihe nach du...

Страница 3: ...raturen nur durch Elektrofachkr fte zul ssig Ger t nur an fest verlegte elektrische Installation mit Leitungen vom Typ NYM O oder NYM J 3 x 1 5 mm anschlie en Vorrichtung zur Trennung vom Netz mit min...

Страница 4: ...ke befestigen ACHTUNG Kurzschlussgefahr und Ger tebesch digung durch Kondenswasserbildung im Geh use L ftungsleitungen fachgerecht thermisch isolieren Montagevorbereitungen wie zuvor beschrieben vorne...

Страница 5: ...mme 5 gem Schaltbild anschlie en Klemmenkastendeckel 8 aufsetzen und verschrauben 8 2 Inbetriebnahme Netzsicherung einschalten Funktionstest durchf hren 8 3 Lamellen ffnungs und schlie winkel Mit den...

Страница 6: ...ziehen Lamellen ffnen oder schlie en nicht Lamellen stark ver schmutzt oder blockiert Lamellen gem Kapitel 10 reinigen Pr fen ob sich Gegenst nde zwischen den Lamellen befinden Diese ggf beseitigen Be...

Страница 7: ...nformation on the relevant subject Action symbol List of work to be carried out Follow the instructions in the order given 3 Product information 3 1 Fig A Equipment overview Sample figure of AE 10 1 H...

Страница 8: ...ed out by trained specialists Only connect device to permanently wired electrical installations with NYM O or NYM J 3 x 1 5 mm cables Fixture for disconnecting from mains with at least 3 mm contact op...

Страница 9: ...rcuits and unit damage by a build up of condensation in the housing Thermally insulate ventilation ducts in professional manner Prepare for mounting as described above 8 Installation Remove the termin...

Страница 10: ...inal block cover 8 on and screw it into place 8 2 Start up Switch the mains fuse on Carry out a function test 8 3 Lamella opening and closing angle Use setting screws 2 and 9 to define how far the lam...

Страница 11: ...n Lamella not opening or closing Lamella very dirty or blocked Clean lamella according to section 10 Check whether there is anything between the lamella Remove if necessary If the fault persists conta...

Страница 12: ...ration Liste d informations importantes relatives au sujet concern Symbole d action Liste indiquant des actions ex cuter Suivez les instruc tions dans l ordre indiqu 3 Informations produit 3 1 Fig A v...

Страница 13: ...ctriciens qualifi s Brancher exclusivement l appareil sur une installation lectrique permanente avec des c bles de type NYM O ou NYM J 3 x 1 5 mm Un dispositif de d connexion du secteur avec au moins...

Страница 14: ...ier 1 avec les vis sur le couvercle ATTENTION Risque de court circuit et d endommagement de l appareil r sultant de la formation de condensation dans le bo tier Effectuer une isolation thermique des g...

Страница 15: ...rm ment au sch ma de branchement Poser le couvercle du bornier 8 et le visser 8 2 Mise en service Enclencher le fusible secteur Effectuer un test de fonctionnement 8 3 Angle d ouverture et de fermetur...

Страница 16: ...s lamelles sont tr s sales ou bloqu es Nettoyer les lamelles comme indiqu au chap 10 V rifiez qu aucun objet ne se trouve entre les lamel les Le cas ch ant le retirer Si le dysfonctionnement persiste...

Отзывы: