background image

IN006 Rev K 0417

1

3 Saber Way, Ward Hill, MA 01835   |   radonaway.com

GP500

Installation & Operating 

Instructions

Содержание GP500

Страница 1: ...IN006 Rev K 0417 1 3 Saber Way Ward Hill MA 01835 radonaway com GP500 Installation Operating Instructions...

Страница 2: ...r installation 5 NOTICE There are no user serviceable parts located inside the fan unit Do NOT attempt to open Return unit to the factory for service 6 All wiring must be performed in accordance with...

Страница 3: ...led properly operates with little or no noticeable noise to the building occupants Ensure a solid mounting for the GP500 to avoid structure borne vibration or noise The velocity of the outgoing air mu...

Страница 4: ...tem malfunction A System Label P N 15022 with instructions for contacting the installing contractor for service and also identifying the necessity for regular radon tests to be conducted by the buildi...

Страница 5: ...electrical tape to seal out moisture A rubber splicing tape or self fusing silicone tape provide best moisture seal 2 2 OUTDOOR BAND JOIST OR SIDEWALL 1 Locate site for GP500 mounting Use the diagram...

Страница 6: ...ducting is secure and vibration free ____ Verify system vacuum pressure with Manometer or other pressure gauge Ensure vacuum pressure is within normal operating range and less than 3 8 WC based on sea...

Страница 7: ...nder this Warranty This Warranty is contingent on installation of the Fan in accordance with the instructions provided This Warranty does not apply where any repairs or alterations have been made or a...

Отзывы: