RadonAway GP500 Скачать руководство пользователя страница 6

IN006 Rev K 0417

6

3 Saber Way, Ward Hill, MA 01835   |   radonaway.com

Under certain circumstances, a flexible pipe coupling, RadonAway 
p/n 79019-1, may ease installation.  This may be  particularly  
true  of  gable side  installations  where the system piping runs 
perpendicular to the floor joists.  Install the pipe coupling as 
shown in Figure 6, making certain to avoid sharp bends or kinks 
in the piping.  (TIP: You may connect the pipe coupling to the 
GP500 before installing the unit through the band joist.)

2.3 MUFFLER INSTALLATION (Optional)

Install the vent muffler assembly in the selected location in the 
outlet ducting.  Solvent weld all connections.  The muffler is 
normally installed at the end of the vent pipe.

2.4 OPERATION CHECKS & ANNUAL SYSTEM MAINTENANCE

____ Verify all connections are tight and leak-free

____ Ensure the GP500 and all ducting is secure and vibration-free.

____ Verify system vacuum pressure with Manometer or other pressure gauge. Ensure vacuum pressure is within 
       normal operating range and less than 3.8” WC (based on sea-level operation, at higher altitudes reduce by 
       about 4% per 1000 Feet). If this is exceeded, increase the number of suction points.

____ Verify Radon levels by testing to EPA Protocol and applicable testing standards.

PRODUCT SPECIFICATIONS

The following chart shows fan performance for the GP500:

 Power: 85-153 watts (varies with actual load conditions) @ 115 VAC
 Inlet/Outlet: 

3” PVC

 Mounting: 

Brackets for vertical mount on bandjoist or sidewall. (16” Mounting Centers)

 

Outdoor installations: GP500 mounts flush to wall projecting only 4” with inlet duct passing 

 

     through the sidewall or band joist.  Power cord is on the inside, simplifying connection.

 Weight: 20 lbs.
 

Recommended ducting: 3” Schedule 20/40 PVC Pipe or attractive thin walled 3” O.D. PVC

 

Storage Temperature Range: 32-100 degrees F

 

Thermally protected

 Size: 

17” x 12” x 4” (plus 7” inlet duct)

Содержание GP500

Страница 1: ...IN006 Rev K 0417 1 3 Saber Way Ward Hill MA 01835 radonaway com GP500 Installation Operating Instructions...

Страница 2: ...r installation 5 NOTICE There are no user serviceable parts located inside the fan unit Do NOT attempt to open Return unit to the factory for service 6 All wiring must be performed in accordance with...

Страница 3: ...led properly operates with little or no noticeable noise to the building occupants Ensure a solid mounting for the GP500 to avoid structure borne vibration or noise The velocity of the outgoing air mu...

Страница 4: ...tem malfunction A System Label P N 15022 with instructions for contacting the installing contractor for service and also identifying the necessity for regular radon tests to be conducted by the buildi...

Страница 5: ...electrical tape to seal out moisture A rubber splicing tape or self fusing silicone tape provide best moisture seal 2 2 OUTDOOR BAND JOIST OR SIDEWALL 1 Locate site for GP500 mounting Use the diagram...

Страница 6: ...ducting is secure and vibration free ____ Verify system vacuum pressure with Manometer or other pressure gauge Ensure vacuum pressure is within normal operating range and less than 3 8 WC based on sea...

Страница 7: ...nder this Warranty This Warranty is contingent on installation of the Fan in accordance with the instructions provided This Warranty does not apply where any repairs or alterations have been made or a...

Отзывы: