Operations
TPS I and III for Eurosystem
12
D1 1004BA1-GB03
3.2.3
Storage of Test Values
The storage of test values is described in the operating manual for the testing lane Eurosystem
(Dok.-No. D1 E101BA1 D04):
=> Section
4.2.6 „Storage of Test Values“
.
3.2.4
Reviewing of Measurements
The reviewing of test values is described in the operating manual for the testing lane
Eurosystem (Dok.-No. D1 E101BA1 D04):
=> Section
4.4 „Reviewing of Measurements“
.
3.2.5
Prepare New Test
Make sure that the temporary storage is empty for beginning a new test procedure and the main
menu appears with the message:
New test can begin ...
After properly storing the test values the main menu appears automatically in test readiness. It
is also possible that the instruction line shows a different ready message or that a test has been
aborted and is to be started again from the very beginning.
Activate the following box in the main menu:
A message about test readiness appears in
the instruction line:
New test can begin ...