13
UK
2-4
FITTING THE TOOL-HOLDING
ARM AND THE RELATED CON-
TROLS
The fitting of the arm can be dangerous, on
account of the considerable weight of the
object (about 60-90 kg).
Carry out the operation with the aid of a
lifting tool, or at least with the assistance of
somebody.
Fasten the base of the BASE-PILLAR-ARM
assembly to the bench (6) (see figure 6) by
means of the 4 screws (7) and the related
nuts (8) and washers (9).
WARNING
Fig.6
With regard to the figure detail, insert the arm
lifting handle (10), then hammer in the related
lockpin (11).
Take jacquard (12) with spacer (13), supplied
in a separate envelope, and fit them to the stud
screwed into the arm.
2-5
FITTING THE TOOL-HOLDING
HEAD
Remove lid (12) from the arm end (see fig. 7).
-
Drive locking knob (13) home as shown in
fig. 8.
-
Slide the Carriage-Fork-Motor assembly into
the slideways, trying to avoid shocks or jolts
capable of affecting the adjustment of the
bearings (fig. 8). The assembly was tested
by our Quality Dept.
-
Screw the lid back into place.
-
Now fasten spring (14) to the arm by using
the screw screwed in the arm itself. Slide
motor electrical cable (15) through the eye
of the spring as shown in fig. 9.
Make sure that the carriage can slide freely
without pulling the cable.
Fig.7
Fig.8
Fig.9
Содержание BIG 800
Страница 5: ......
Страница 8: ......
Страница 16: ......
Страница 17: ......
Страница 20: ......
Страница 24: ......
Страница 29: ...28 NOTES...
Страница 31: ......
Страница 34: ......
Страница 42: ......
Страница 43: ......
Страница 46: ......
Страница 50: ......
Страница 55: ...54 NOTES...
Страница 57: ......
Страница 60: ......
Страница 68: ......
Страница 69: ......
Страница 72: ......
Страница 76: ......
Страница 81: ...80 NOTE...
Страница 83: ......
Страница 86: ......
Страница 94: ......
Страница 95: ......
Страница 98: ......
Страница 102: ......
Страница 107: ...106 NOTAS...
Страница 109: ......
Страница 112: ......
Страница 120: ......
Страница 121: ......
Страница 124: ......
Страница 128: ......
Страница 133: ...132 OPMERKINGEN...
Страница 142: ...141 TAB 1 BENCH GROUP PL 1 GROUPE BANC TAV 1 GRUPPO BANCO TAB 1 GRUPO BANCO AFB 1 BANKEENHEID...
Страница 146: ...145 TAB 2 PILLAR GROUP PL 2 GROUPE MONTANT TAV 2 GRUPPO COLONNA TAB 2 GRUPO COLUMNA AFB 2 ZUILEENHEID...
Страница 150: ...149 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Страница 154: ...153 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Страница 158: ...157 TAB 4 FORK GROUP PL 4 GROUPE FOURCHE TAV 4 GRUPPO FORCELLA TAB 4 GRUPO HORQUILLA AFB 4 VORKEENHEID...
Страница 162: ...161 TAB 4 FORK GROUP PL 4 GROUPE FOURCHE TAV 4 GRUPPO FORCELLA TAB 4 GRUPO HORQUILLA AFB 4 VORKEENHEID...
Страница 166: ......
Страница 170: ......
Страница 179: ...178 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Страница 181: ...180 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Страница 183: ...182 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Страница 185: ...184...