11
UK
1-10 DIRECTIONS FOR INSTALLA-
TION
To keep the machine in perfect working condi-
tion and to ensure precise and safe operation
for a long time, scrupolously follow the direc-
tions for installation given below.
- The machine must be installed in a closed,
dry place, with a temperature of +10
°
C to
+40
°
C.
- Sufficient space must be left clear around the
machine, so as to prevent the operator from
being jammed between the moving parts of
the machine and any surrounding object.
- The feeder cable must be laid in such a way
that it does not cause the operator to stumble.
- Mains voltage variations must not exceed
±
10%.
- The earth wire of the machine must be con-
nected to the earth wire of the plant.
1-11 DISCONNECTING PROCEDURE
Before carrying out any operation on the
machine, the following two-step disconnecting
procedure is to be followed:
A: Disconnect the machine from the mains.
B: Make sure that no power is being supplied
and that no residual energy is present.
A single person is to be responsible for the
carrying out of both operations.
Whenever the machine fails to operate, per-
form the above-mentioned disconnecting pro-
cedure and point out the situation with a clearly
visible inscription.
Fig.3
Содержание BIG 800
Страница 5: ......
Страница 8: ......
Страница 16: ......
Страница 17: ......
Страница 20: ......
Страница 24: ......
Страница 29: ...28 NOTES...
Страница 31: ......
Страница 34: ......
Страница 42: ......
Страница 43: ......
Страница 46: ......
Страница 50: ......
Страница 55: ...54 NOTES...
Страница 57: ......
Страница 60: ......
Страница 68: ......
Страница 69: ......
Страница 72: ......
Страница 76: ......
Страница 81: ...80 NOTE...
Страница 83: ......
Страница 86: ......
Страница 94: ......
Страница 95: ......
Страница 98: ......
Страница 102: ......
Страница 107: ...106 NOTAS...
Страница 109: ......
Страница 112: ......
Страница 120: ......
Страница 121: ......
Страница 124: ......
Страница 128: ......
Страница 133: ...132 OPMERKINGEN...
Страница 142: ...141 TAB 1 BENCH GROUP PL 1 GROUPE BANC TAV 1 GRUPPO BANCO TAB 1 GRUPO BANCO AFB 1 BANKEENHEID...
Страница 146: ...145 TAB 2 PILLAR GROUP PL 2 GROUPE MONTANT TAV 2 GRUPPO COLONNA TAB 2 GRUPO COLUMNA AFB 2 ZUILEENHEID...
Страница 150: ...149 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Страница 154: ...153 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Страница 158: ...157 TAB 4 FORK GROUP PL 4 GROUPE FOURCHE TAV 4 GRUPPO FORCELLA TAB 4 GRUPO HORQUILLA AFB 4 VORKEENHEID...
Страница 162: ...161 TAB 4 FORK GROUP PL 4 GROUPE FOURCHE TAV 4 GRUPPO FORCELLA TAB 4 GRUPO HORQUILLA AFB 4 VORKEENHEID...
Страница 166: ......
Страница 170: ......
Страница 179: ...178 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Страница 181: ...180 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Страница 183: ...182 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Страница 185: ...184...