Transverse positioning of the fence, equipped with
reference stops, to drill transverse holes on side pan-
els for the insertion of support panels
Transverse positioning of two fences, equipped with
reference stops, to drill simultaneously transverse
holes on side panels for the insertion of support
panels
Pag. 23
DRILLING EXAMPLES USING FRAME FENCE
Example of the use of the standard dimension fence
to drill simultaneously two frames at 0° - 90°
Example of the use of the triangular fence to drill
simultaneously two frames to be joined at 45° - 45°
Montaggio di rifermento
Содержание 16271400
Страница 2: ...This page intentionally left blank...
Страница 4: ...This page intentionally left blank...
Страница 7: ......
Страница 36: ...MAGGI TECHNOLOGY srl Vendita ed Assistenza Tecnica Via delle Regioni n 299 50052 CERTALDO Fi ITALIA Ship to...
Страница 38: ...1 26273000 Pag 31...
Страница 40: ...Pag 33 2 26272100...
Страница 42: ...3 26271200 Pag 35...
Страница 44: ...Pag 37 4 26271301...
Страница 46: ...Pag 39 5 26271300...
Страница 48: ...Pag 41 6 26271400...
Страница 50: ...7 26272500 Pag 43...
Страница 52: ...8 26271600 Pag 45...
Страница 54: ...9 262517 Pag 47...
Страница 56: ...Pag 49 10 26054810...
Страница 58: ...PNEUMATIC SYSTEM Pag 51...
Страница 61: ...This page was intentionally left blank...