background image

 

 

 

 
 
 

!

 Warning  - danger or risk of injury 

 

  !

       Important note or statement

 

 

 
 
 
 
 

Please read these instructions carefully before using the AK6000 control unit 

 

 

Do not 

use the boiler until completely installed

 

 

 

When the boiler is 

ON

 you can not do the following  

o

 

remove enclosure from the electrical parts  - for example electronic modules, fans, sensors, 

thermostat  etc.  

o

 

replace the fuses 

o

 

repair damaged cables and modules etc. 

 

Before removing the cover of the electrical parts or other apliances is important to disconect the 

power cord from the AC outlet. 

 

Do not operate the boiler unless all enclosure panels are properly in place 

 

In case of failure detection or damaging any part is important 

o

 

 do not touch any part of boiler 

o

 

 immediately disconect boiler out of the AC outlet 

o

 

 refer all servicing to qualified service personnel  

 

This appliance is not suitable for person which were not instructed by the responsible operator for 

using the appliance or whose have physical and other disability which prevents from the safe 

operation on the apliances  

 

!

 Improper connection of the equipment can result in risk of electric shock. Check with qualified 

electrician or service representative if you are in doubt whether the boiler is properly 

 

 

Safety Instructions 

Important Symbols 

Содержание MA 15

Страница 1: ...MA 31 MA 40 MA 49 MA 80 With an exhaust fan and CONTROL UNIT ERS AK 6000 BOILER OPERATION AND MAINTENANCE MANUAL MAGA s r o S Koll ra 86 979 01 eren any Rimavsk Sobota Slovakia Tel fax 421 47 56 34 79...

Страница 2: ...and a minimum return water temperature of 60 C 140 F The pump must be connected to the thermo switch in such a way that it only operates when the required minimum temperature is reached 4 The boiler m...

Страница 3: ...25 0 25 Boiler Weight kg 310 350 380 Exhaust Socket Diameter mm 159 159 159 Boiler Height mm 1120 1120 1210 Boiler Depth mm 1000 1140 1140 Boiler Width mm 570 570 570 Water capacity l 65 70 75 Boiler...

Страница 4: ...red boiler must be operated in accordance with the instructions contained in this operating and maintenance manual The boiler must be operated by adults only CAUTION When you fire up a new boiler for...

Страница 5: ...y For the boilers MA approximate dimensions of the boiler s cross section are 20 x 20 cm Minimum height 7 m 20 cm Minimum height 8m Exact dimensions of a chimney for this purpose in Slovakia are gover...

Страница 6: ...al s such floor must be shielded with a thermally insulating fireproof board extending at least 300 mm beyond the ground plan on the firetending side and at least 100 mm beyond the ground plan on all...

Страница 7: ...nce to a boiler that is currently under operation When operating a solid fuel fired boiler no inflammable liquids are permitted to be used for firing up Increasing in any manner a boiler s output capa...

Страница 8: ...et 9 Primary air inlet 10 Ceramics nozzle 11 Firing flap valve 12 Primary air inlet duct 13 Clean out cover 14 Smoke flue outlet 15 Firing valve s draw rod 16 Fuse 17 Chimney sensor flue gas temperatu...

Страница 9: ...lly or through an electronic regulating device that will provide a more comfortable and more economic operation of the boiler Any related electrical wiring and devices must be done installed by author...

Страница 10: ...Boiler Installation Connection with a Thermoregulating Valve Boiler Installation Connection with a Heat Storage Tank...

Страница 11: ...he storage tank and the outdoor temperature Recommended heat storage unit sizes Boiler Type MA 15 MA 20 MA 25 MA 31 MA 40 MA 49 MA 80 Capacity kW 15 20 25 31 40 49 80 Volume l 1000 1000 1500 1500 2000...

Страница 12: ...WATTS STS 20 connected to water supply piping In the event you use your own well you can protect your boiler using a backup electric power source to sustain the operation of at least one pump Another...

Страница 13: ...before you fill up the boiler with heating water The Danfoss BVTS Honeywell TS 130 or the WATTS STS 20 valve the sensor of which is located in the lateral part of the boiler is intended to protect the...

Страница 14: ...18 CONTROL UNIT ERS AK 6000 AK 6000 Maga Wood Gasifying Boilers Control System User Manual...

Страница 15: ...outlet Do not operate the boiler unless all enclosure panels are properly in place In case of failure detection or damaging any part is important o do not touch any part of boiler o immediately discon...

Страница 16: ...l suply ending after fuel suply is passed by menu level or choice confirmation data storage o long 2 sec pressing entrance to user operation settings button decreasing adjusted value or switching depi...

Страница 17: ...peed in suction version or to 0 in blower version Combustion Continuous regulation of the fan keeps the boiler temperature on the acquired value Critical values of temperatures and thermostat automati...

Страница 18: ...r and make all required action Short press the ENTER boiler gets in original state again End of the combustion Combustion temperature decreases under the minimal value boiler is automatically turned O...

Страница 19: ...two seconds long Basic view goes to the frame 1 where we use short click on the ENTER and we are in the frame 1 1 Short click of the ENTER and we can set required temperature by buttons or in 70 85 C...

Страница 20: ...ut It keeps the embers waiting 50 130 C Main fan power change For example value 3 decreases fan speed in 30 3 2 2 3 Fan minimal speed This value is limit for speed decrease of the fan after reaching r...

Страница 21: ...ouble click of the ESC All the connected accsesories are monitored by system Common error status is displayed by red color of the LED More exactly is error message displayed on the LCD display in the...

Страница 22: ...t basic view we must hold the button ENTER two seconds long One click on the button will get us to the frame 6 By means of the ENTER button we can enter into the version display By means of the ENTER...

Страница 23: ......

Страница 24: ...n date Stamp and signature of the producer Date of sale Stamp and signature of the seller Date of putting into operation Stamp and signature Letter of guarantee is not valid unless properly filled in...

Страница 25: ...of product Guarantee does not include any materials that are subject to common wear and tear sealing and packing rope fire concrete block and filling and sibral filling Guarantee will not be granted...

Страница 26: ...Record of performed guarantee repairs Record of performed repairs within guarantee period and after Date of the record Performed activity Organization signature stamp Signature of the customer...

Страница 27: ...MA 15 MA 20 MA 25 MA 31 MA 40 MA 49 MA 80 Producer MAGA s r o S KOLL RA 86 EREN ANY 979 01 RIMAVSK SOBOTA SLOVAKIA Above mentioned products are compatible with the following standards EN 303 5 2001 S...

Отзывы: