E8
HOW TO USE
Directly Fitted Pump into the Drum
1. Insert the suction tube of pump into the drum and secure with ring nut, suitable for
commercial drums with 57mm diameter hole and threading 2” BSP
2. Fit a oil delivery tube for oil outlet of the air operated pump using only high quality tubes
(normally 1/2”, according to DIN-SAE norms(), by means of 1/2” BSP threading fitting.
3. Oil delivery pistol: Connect delivery tube with delivery pistol using suitable pipe fittings, and
point the pistol at right place.
4. Air inlet connection is 1/4” quick plug ( or 1/4” NPT female) in all versions. Compressed air
connection ( to be supplied by the customer) should be done using suitable tube.
5. A pressure regulator to keep the pump’s working pressure at the best possible level (max
5-10 bar) between the pump and the compressed air line
6. A cut-off switch can enable the operator to stop the pump at any given moment by cutting
the air supply off between the pump and the compressed air line
7. Switch on all switch.
WALL INSTALLED
Part List
Proceed As Follows
1. Secure the bracket to the wall using the dowels at about 1200mm height appropriate for the
tank’s dimensions. Make sure that the wall is solid and thick enough for the dowels. Do not
interfere with hydraulic tubes or electric lines.
2. Secure the pump to the bracket 2
3. Connect the flexible suction tube 4 to the pump using the clamp provided.
4. Connect the rigid suction 7 to the end of the flexible suction tube 4 using the elastic clamp
provided
5. Put the bung adapter 6 into the drum hole.
6. Put the rigid suction tube 7 into the pump and secure it in place
QTY
1
1
1
1
1
1
1
1
1
1
1
Description
Oil pump
Wall bracket
Pump adapter
Flexible suction hose
Suction hose adapter
Bung adapter
Rigid suction tube
Spring circlip
Ball
Valve seat
Filter
Part No.
1
2
3
4
5
6
7
8
9
10
11