28 |
P a g e
4.
With man 2 supporting the machine at centre, (fig 3). Man 1 releases the brakes
and walks the base backwards until the machine is fully open.
5.
Detach clip and remove hinge pin from belt retaining device (RH) then locate pin
through the hinge (LH) and replace clip.
6.
The head of the machine is now ready to be raised on to the roof/ scaffold by
block and tackle or rope. Ensure lifting device is secure and safe. The base is
guided and positioned by man 1. (fig. 4)
Содержание Bumpa Petrol 6m
Страница 12: ...12 P a g e 1 Base emergency stop 4 Engine stop switch 2 Pull start 5 Handset Stop 3 Choke CONTROLS...
Страница 34: ...34 P a g e Decal Diagram...
Страница 36: ...36 P a g e 6m Bumpa 8m Bumpa 10m Bumpa DIMENSIONS...
Страница 37: ...37 P a g e 6m Bumpa OPERATING ANGLES...
Страница 38: ...38 P a g e 8m Bumpa...
Страница 39: ...39 P a g e 10m Bumpa...