background image

37 | 

P a g e

 

 

 

 

 

 

6m Bumpa 

 

 

 

OPERATING 
ANGLES 

Содержание Bumpa Petrol 6m

Страница 1: ...1 P a g e Operators manual Bumpa Petrol 6m 8m 10m MANUFACTURERS ORIGINAL INSTRUCTIONS MCE BUMPA 21 A1 4...

Страница 2: ...Damaged Machine Hazard 10 COMPONENT DAMAGE HAZARD 10 LEGEND 11 CONTROLS 12 PRE OPERATION INSPECTION 13 MAINTENANCE 16 Check main belt tension and tracking 17 Check wheel brakes 18 Scheduled Maintenanc...

Страница 3: ...tted to operate this machine This manual should be considered a permanent part of your machine and should remain with the machine at all times If you have any questions please call Mace Industries Con...

Страница 4: ...ituations Know and understand the safety rules before going on to the next section 2 Always perform a pre operation inspection 3 Always perform function tests prior to use 4 Inspect the workplace 5 On...

Страница 5: ...for welding Ensure safe routing of power cable to minimise risk of electrocution Maintain safe distances from electrical power lines and apparatus in accordance with applicable governmental regulatio...

Страница 6: ...move the machine until energized power lines are shut off Do not operate the machine during lightning or storms Do not use the machine as a ground for welding Ensure safe routing of power cable to mi...

Страница 7: ...to machine stability with items of different weight or specification Be aware of ground surface prior to installation Do not place ladders or scaffolding against any part of this machine Do not use t...

Страница 8: ...to do so could result in serious injury Do not lean over machine while belt is moving Do not lean over discharge head of machine whilst loading unloading Ensure loading guides are set central to the l...

Страница 9: ...9 P a g e Bodily Injury Hazard Use common sense and planning when installing and operating the machine Keep hands and limbs away from moving belt Always wear correct PPE...

Страница 10: ...for welding Damaged Machine Hazard Do not use a damaged or malfunctioning machine Conduct a thorough pre operation inspection of the machine and test all functions before each work shift Immediately t...

Страница 11: ...idicator 13 Scaffold stand 2 Controls 8 Belt Carrier 14 Top belt guide 3 Stop gate 9 Machine trestle 15 Adjuster head 4 Loading guides 10 Hinge 16 Shute 5 Wheel 11 Remote handset 17 10m prop 6 Hondda...

Страница 12: ...12 P a g e 1 Base emergency stop 4 Engine stop switch 2 Pull start 5 Handset Stop 3 Choke CONTROLS...

Страница 13: ...contained in this operator s manual 1 Avoid hazardous situations 2 Always perform a pre operation inspection Know and understand the pre operation inspection before going on to the next section 3 Alw...

Страница 14: ...al may be performed by the operator Refer to the list on the next page and check each of the items and locations for modifications damage or loose or missing parts A damaged or modified machine must n...

Страница 15: ...components or areas for damage modifications and improperly installed or missing parts o Electrical components o Limit switch o Handset o Wiring o Stop gate o Drive motor o Tyres and wheels o Brakes o...

Страница 16: ...g to the manufacturer s specifications and the requirements specified in the responsibility s manual Maintenance symbols legend The following symbols have been used in this manual to help communicate...

Страница 17: ...lt tension can damage machine components Check belt tension whilst power is off 1 The main belt will only need to be tensioned if it is slipping under load 2 When the Bumpa is unfolded measure the dis...

Страница 18: ...whilst brake is operated ___________________________________ Check Honda GX120 engine Maintaining the engine oil level and condition is essential to good machine performance and service life Operatin...

Страница 19: ...to perform maintenance on this machine according to the procedures found in the service manual for this machine Machines that have been out of service for more than three months must receive the quart...

Страница 20: ...in this operator s manual 1 Avoid hazardous situations 2 Always perform function tests prior to operation Know and understand the function tests before going on to the next section 3 Always perform fu...

Страница 21: ...nctions A malfunctioning machine must never be used If malfunctions are discovered the machine must be tagged and removed from service Repairs to the machine may only be made by a qualified service te...

Страница 22: ...ion 4 Unfold machine insert pin through hinge and place end of machine on a trestle 5 Plug handset into top of machine 6 Attach Honda GX120 motor 7 Attach 2 black drive belts At the ground controls 8...

Страница 23: ...this operator s manual 1 Avoid hazardous situations 2 Always perform function tests prior to operation 3 Always perform function tests prior to use 4 Inspect the workplace Know and understand the func...

Страница 24: ...the workplace hazards then watch for and avoid them while moving setting up and operating the machine Workplace Inspection Be aware of and avoid the following hazardous situations Bumps floor obstruc...

Страница 25: ...safe machine operation contained in this operator s manual 1 Avoid hazardous situations 2 Always perform function tests prior to operation 3 Always perform function tests prior to use 4 Inspect the w...

Страница 26: ...l must be loaded responsibly and with skill by the operator as to not cause damage by overloading the conveyor Only trained and authorized personnel should be permitted to operate a machine If more th...

Страница 27: ...to opening the machine 2 Lock wheel brakes on then with man 1 standing on the hoop at the base of machine to counterbalance weight man 1 must remain in position to counterbalance machine throughout op...

Страница 28: ...hine is fully open 5 Detach clip and remove hinge pin from belt retaining device RH then locate pin through the hinge LH and replace clip 6 The head of the machine is now ready to be raised on to the...

Страница 29: ...or roof Fig 5 Alternatively the head can be clamped to the handrail using the clamp provided Fig 6 Ensure returning belt carriers clear scaffold before starting machine 8 With the machine secured on...

Страница 30: ...is over recess in engine cradle Operate lever to tension belts Fig 10 Rotate belt cover back into position and lock anti luce fastener Plug stop lead into machine Never operate machine with cover open...

Страница 31: ...locking when extended however lever must be lifted to retract Never operate 10 metre machine without prop in place as machine will be unstable Periodically check prop positioning during operation 10...

Страница 32: ...arked on a level surface The machines brakes must remain on whilst being transported Securing to Truck or Trailer for Transit Always check the machine wheel brakes are on in preparation for transport...

Страница 33: ...tions Diagram number Description Quantity 1 Operating angle 1 2 Safety instruction 1 3 Main belt adjustment 2 4 Machine opening instruction 1 5 Mace address and Logo 1 6 Serial number and machine type...

Страница 34: ...34 P a g e Decal Diagram...

Страница 35: ...payload overall 80kg 80kg 80kg Maximum carrier payload 20kg 20kg 20kg Belt speed 20m min 20m min 20m min Maximum angle 65 65 65 Electric motor 0 75kw 0 75kw 0 75kw Storage dimensions flat 0 85m x 6 3...

Страница 36: ...36 P a g e 6m Bumpa 8m Bumpa 10m Bumpa DIMENSIONS...

Страница 37: ...37 P a g e 6m Bumpa OPERATING ANGLES...

Страница 38: ...38 P a g e 8m Bumpa...

Страница 39: ...39 P a g e 10m Bumpa...

Отзывы: