21 |
P a g e
Fundamentals
The function tests are designed to discover any malfunctions before the machine
is put into service.
The operator must follow the step-by-step instructions to test all machine
functions.
A malfunctioning machine must never be used. If malfunctions are discovered,
the machine must be tagged and removed from service.
Repairs to the machine may only be made by a qualified service technician,
according to the manufacturer's specifications.
After repairs are completed, the operator must perform a pre-operation
inspection and function tests again before putting the machine into service.
Содержание Bumpa Petrol 6m
Страница 12: ...12 P a g e 1 Base emergency stop 4 Engine stop switch 2 Pull start 5 Handset Stop 3 Choke CONTROLS...
Страница 34: ...34 P a g e Decal Diagram...
Страница 36: ...36 P a g e 6m Bumpa 8m Bumpa 10m Bumpa DIMENSIONS...
Страница 37: ...37 P a g e 6m Bumpa OPERATING ANGLES...
Страница 38: ...38 P a g e 8m Bumpa...
Страница 39: ...39 P a g e 10m Bumpa...