email | [email protected]
tel | 866-931-8021
6.
STEP 2:
MAIN POWER INSTALLATION
STEP 1:
INSTALLATION PREPARATION
To get started watch our installation video:
https://youtu.be/lUfEp8gVYvE
The Solar Tracker can be POWERED ON with the provided activation
magnetic pawn key
, see below for placement. It is important to note
that the SATST4950 battery in the device should be charged before
installation.
Blue LED means the device is connected to the cellular network- ON
Red - means the device is powered off
The SATST4950 ships with a minimal battery charge. To ensure
uninterrupted operation when first deployed, the device should be
charged for a minimum of 7 hours by the sun light or by using the
optional wall charger accessory or hardwired installation cable provided.
*For pre-charge option using the Hardwired cable connected the
RED
wire to + 12-volt battery power, Black wire to the -Ground to chassis
ground.
Connect the
RED wire to (+) 12 Volt constant power or directly to the
asset’s battery.
Chassis Ground
Connect the
BLACK (-) Input wire to a solid chassis ground uninhibited
by paint or rust. Connect the ground wire directly to the asset’s chassis
and secure the connection with a factory bolt or aftermarket self-tapping
screw.
Yellow Wire
N/A-Not used for this application
3 Seconds or Longer
About 1 Second
2 Red = OFF
Turn Device On
Action
Magnetic Keep
in Position
LED Flash
Pattern
3 Red, Then When
Cellular Connects: OK, 1 Blue
2 Blue = ON
Check Status
Содержание SATST4950
Страница 1: ...SATST4950 HARDWARE INSTALLATION MANUAL...
Страница 7: ...m2minmotion com LEARN MORE...