background image

email | [email protected] 

tel | 866-931-8021

6.

STEP 2:

MAIN POWER INSTALLATION

STEP 1:

INSTALLATION PREPARATION 

To get started watch our installation video:

https://youtu.be/lUfEp8gVYvE

The Solar Tracker can be POWERED ON with the provided activation 

magnetic pawn key

, see below for placement. It is important to note 

that the SATST4950 battery in the device should be charged before 

installation.

Blue LED means the device is connected to the cellular network- ON

Red - means the device is powered off

The SATST4950 ships with a minimal battery charge. To ensure 

uninterrupted operation when first deployed, the device should be 

charged for a minimum of 7 hours by the sun light or by using the 

optional wall charger accessory or hardwired installation cable provided. 

*For pre-charge option using the Hardwired cable connected the 

RED

 

wire to + 12-volt battery power, Black wire to the -Ground to chassis 

ground.  

Connect the 

RED wire to (+) 12 Volt constant power or directly to the 

asset’s battery. 

Chassis Ground 

Connect the 

BLACK (-) Input wire to a solid chassis ground uninhibited 

by paint or rust. Connect the ground wire directly to the asset’s chassis 

and secure the connection with a factory bolt or aftermarket self-tapping 

screw.

Yellow Wire 

N/A-Not used for this application

3 Seconds or Longer

About 1 Second

2 Red = OFF

Turn Device On

Action

Magnetic Keep 

in Position   

LED Flash 

Pattern

3 Red, Then When 

Cellular Connects: OK, 1 Blue

2 Blue = ON

Check Status

Отзывы: