email | [email protected]
tel | 866-931-8021
8.
STEP 4:
MAIN POWER INSTALLATION
After installation, move the asset outside allowing time for the GPS
receiver to receive a good signal from the GPS satellites and confirm the
Blue light is on the Device,
Note; Power pawn key is required to check
device status.
Hard Wire Installation (OPTIONAL)
If using the optional hardwire install cable, see the chart below for the
wiring diagram to connect to the power source – 2 wire install (red &
black). If installing device as hard wire installtion, battery life will be
dramatically extended between recharges.
Pin #
1
12-33 Volts DC
2
Black
Ground
3
Red
Not used on the SATST4950
Yellow
Wire
Color
Function
Note
Battery Charge
Available on SATST4950B
Chassis Ground
STEP 3:
MAIN POWER INSTALLATION
Mount the device cradle securely to the vehicle or Asset’s chassis using
screws or nut and bolts and add 4 zip-ties to the cradle locks to keep the
device securely in the cradle, Cut off all excess cable ties.
OPTIONAL ACCESSORIES
ACSTCRD
Magnetic Mounting cradle
ACSTWC
Wall Charger and power cable w/DC jack
Device quick connect cable
Содержание SATST4950
Страница 1: ...SATST4950 HARDWARE INSTALLATION MANUAL...
Страница 7: ...m2minmotion com LEARN MORE...