background image

A.    Install the 5/16” EYEBOLTS to the outer ends of the boom, securing with stainless 5/16” nuts and 
lock washers. Align the eyes parallel with the boom and tighten. 
 
12.  For ease of element installation, support the boom about 2-3 feet above ground. Loosely attach 
the BOTTOM CRADLES to the bottoms of the clamp plates using the 1/4-20 x 2-3/4" bolts.  (BE SURE 
TO USE ZINC PASTE ON THESE THREADS). Slide the REFLECTOR clamp plate onto the boom 
end. Level the reflector element and tighten all four bolts EVENLY and firmly.  Repeat for the DRIVEN 
ELEMENT on the other end of the boom. ADJUST EITHER ELEMENT TO THE PROPER SPACING 
BETWEEN ELEMENTS.  Make sure the saddles are straight and level. A cocked clamp will loosen 
quickly in the first wind. Align the elements and tighten the hardware 
13. Now take a step back for a moment to observe any misalignment (if any) and the “droop”  in each 
element.  Simply look down either the front or back of the boom to do this.  If you have not already 
done so, adjust each turnbuckle until each element droops 6 to 10 inches at the tip. NOTE: The 
elements are the most stable in wind with a small amount of tip droop. ADJUST FOR LEVEL INNER 
SECTIONS AND THE CORRECT TIP DROOP WILL BE AUTOMATIC. After the adjustments have 
been made, proceed with tightening the 1/4-20 JAMNUT on all the turnbuckles. 
 
14. 1:1 HF BALUN INSTALLATION — SEE ASSEMBLY DRAWINGS AND DIMENSION SHEET 
Mount the balun to the angle plate on the driven element using a 2-1/2” U-bolt and saddle. Be sure the 
balun vent hole is down. Do not over tighten as balun damage may occur. 
 
15. INSTALLING THE HAIRPIN (MATCHING ASSEMBLY) 
A.  Apply a little Penetrox to the balun terminal lugs.  Remove the nuts holding the 3/8 clamp blocks 

and place the balun lead lugs over the studs. Replace the nuts loosely. Apply a little Penetrox to 
the shorter bent ends of the hairpin tubes.  INSERT the tubes into the grooved channels of 3/8” 
clamp block assemblies on 

Driven

 

element.  

Push the tubes through until at least 1/4" extends 

beyond clamp and then tighten the clamp bolt slightly to hold the tubes from slipping. Rotate the 
tubes so the bends are level and the long sections are parallel to the boom. 

B.  Install the 1/4-20 x 1/4” set screws into the ends of the HAIRPIN SHORTING BAR.  Insert a 1/4-20 

x 2” bolt into the hole of the #52 stainless band clamp from the inside and add the 3/8” x 1” 
aluminum spacer. Add the shorting bar and the lock nut loosely to hold the assembly together. 
Open the clamp and set it over the boom about 60 inches from the driven element. Now slide the 
assembly to the ends of the hairpin tubes and insert the end into the shorting bar. ( lubricant like 
WD-40 or zinc paste will let the shorting bar slide easier on the tubes.  Position the shorting bar 38 
inches from the driven element. Align the assembly, and tighten the band clamp.  Next tighten the 
nut securing the shorting bar and finally tighten the set screws onto the tube.  NOTE: IF YOU CAN 
DO FINAL VSWR MEASURMENTS AND ADJUSTMENTS DURING THE FINAL INSTALLATION, 
DO NOT TIGHTEN THE SET SCREWS YET.  SEE THE NOTE AT THE BOTTOM OF THE 
“DIMENSION SHEET” 

C.  Now return the to balun end of the hairpin assembly and final tighten the bolts holding the tube 

ends and the balun leads. 

 
16 Attach the BOOM TO MAST PLATE at the balance point, using the two large 3” U-bolts, 3/8-16 
stainless lockwashers, and nuts.  Align plate to vertical and tighten nuts.   
 
17.  OVERHEAD  BOOM SUPPORT SYSTEM.   
A. Attach one end of the 5/16" Dacron cord to the rear eyebolt using two turns around the eyebolt and 
a series of three half hitches or equivalent knots. Finish with about 6 inches of cord after the knots. 

Without cutting the cord, do the same at the front eyebolt.

  Pull on the knots 

HARD 

to

 SET

  them. 

Seal ends with heat or flame to prevent fraying. Tape the excess 6 inches of cord back to main cord 
tightly with black vinyl electricians tape.  

40M3L ASSEMBLY MANUAL 

Содержание 40M3L

Страница 1: ...nding performance that will deliver years of enjoyment on the 40 meter band Mechanically the elements are mounted between 1 2 thick machined aluminum clamp plates The Driven element is split and insul...

Страница 2: ...G ROD into a CLAMP PLATE ASSEMBLY Center the assembly and align the bolt holes to vertical Tighten all four outer element clamp plate bolts EVENLY Make sure plates remain parallel top to bottom 2 VERT...

Страница 3: ...sections into the swaged 1 sections and secure with 8 32 x 1 1 4 screws and locknuts NOW IS THE TIME TO DETERMINE WHAT PART OF THE BAND YOU WANT TO USE MOST AND EMPHASISE THE 3 BAND SEGMENTS INSURE V...

Страница 4: ...MENSION SHEET NOTE the dimension is measured from the OUTSIDE edge of the LL arm to the OUTSIDE edge of the shorting bar USING A BLACK PERMANENT MARKING PEN OR EQUIVALENT MARK THE SPOT ON THE ROD WHER...

Страница 5: ...n tubes INSERT the tubes into the grooved channels of 3 8 clamp block assemblies on Driven element Push the tubes through until at least 1 4 extends beyond clamp and then tighten the clamp bolt slight...

Страница 6: ...roops again following final adjustments check your knots They may be may be slipping D After final installation of the antenna the turnbuckle plate installed loosely with a 2 U bolt is raised up the m...

Страница 7: ...2 1 7 0 7 130 7 1 7 240 7 150 7 30 REFLECTOR 58 50 50 50 47 50 DRIVEN 44 50 37 50 34 50 DIRECTOR 39 50 31 50 28 50 S HAIRPIN SHORT 36 36 36 108 5 108 5 108 5 ON ALL EIGHT HALF ELEMENT SECTIONS 1 X 1...

Страница 8: ...POST 1 4 20 X 2 BOLT LOCKNUT DRIVEN ELEMENT HARDWARE 8 32 X 1 SCREW LOCKNUT 5 PER SIDE 1 1 4 X 24 FIBERGLASS ROD 1 3 8 X 23 13 16 SLEEVE 1 1 2 X 60 SOE 1 4 20 X 2 3 4 BOLT LOCKWASHER STRAIN RELIEF HPT...

Страница 9: ...8 CLAMP BLOCKS HAIRPIN TUBE 3 8 ALUM TUBE 2 1 1 BALUN AREA TOP VIEW HAIRPIN SHORTING BAR DETAIL END VIEW 3 8 X 1 SPACER 1 4 20 X 2 BOLT LOCKNUT BAND CLAMP 52 1 20 X 1 4 SET SCREW LINEAR LOADING HARDWA...

Страница 10: ...GENERIC COMPRESSION CLAMP DETAIL NOTE Generic layout to show how compression clamps work Your antenna may have one or the other or may even have both compression clamp sizes...

Страница 11: ...Element section 3 4 x 049 x 48 SOE 6 Element tip section 1 2 x 049 x 61 50 2 Element tip section 1 2 x 049 x 47 50 2 Element tip section 1 2 x 049 x 42 50 2 Hair pin tube 3 8 x 55 2 ALUMINUM ROD DESC...

Страница 12: ...stainless 14 Bolt 1 4 20 x 2 0 stainless 5 Set screws 1 4 20 x 1 4 ss 2 Nut 1 4 20 stainless 6 Nut 1 4 20 locking stainless 27 Allen wrench 1 8 1 BAG 9 5 8 Compression clamp 6 Screw 8 32 x 1 3 4 panhe...

Отзывы: