background image

B. TEMPORARILY insert a 2 inch U-bolt through the turnbuckle plate and add two nuts so about 1/2 
inch of the threads stick out.  Insert this assembly through the top set of 2” U-bolt holes in the boom to 
mast plate from the boom side and add two more nuts.  Open the two turnbuckles up so just 

a

 

thread

 

or two

 from each end shows 

inside

 the body of the turnbuckle. Hook the turnbuckles into the holes at 

the edge of the turnbuckle plate.  Equalize the Dacron cord over the plate and cut it.  Take two wraps 
of the cord through the eye of the rear turnbuckle, PULL the cord as tight as possible and make the 
knots as before. Repeat for the front cord section and turnbuckle. Cut off any excess over one foot 
long and again seal and tape back to the main cord.   
 
C. Now DISASSEMBLE the U-bolt from the boom to mast plate. Before installation, if possible, install 
a short temporary mast, attach turnbuckle, and let the overhead guy system support the boom 
overnight. The Dacron cord DOES NOT STRETCH UNDER THIS LOAD but it's weave will take a SET 
and the boom may droop just a bit.  If your boom droops again following final adjustments, check your 
knots. They may be may be slipping. 
 
D. After final installation of the antenna, the turnbuckle plate, installed loosely with a 2” U-bolt, is raised 
up the mast. When the boom is straight the U-bolt is tightened. This should place the turnbuckle plate 
4 to 6 feet above the boom. Do the final boom straightening with the turnbuckles and safety wire to 
preserve adjustments. 
 
18. Check ALL hardware for tightness. Check ALL element sections, especially tip sections, for correct 
placement. Make any final adjustments to linear loading tension. 
 
19. Attach the feedline section to the balun. Route it towards the boom to mast plate.  Secure at 
regular intervals with tape or nylon ties. 
 
20. When mounting this antenna on a tower or mast with other antennas there may be interaction.  In 
general VHF and/ or UHF antennas mounted for HORIZONTAL POLARITY should be AT LEAST 40 
inches above or below the antenna. Use good quality 50 Ohm coaxial cable to feed the antenna and 
be sure your tower and rotator system can handle the wind loading and vertical weight of this antenna.  

 

THIS COMPLETES ANTENNA ASSEMBLY 

 

M

2

 ANTENNA SYSTEMS, INC. 

4402 N. SELLAND  AVE. 

FRESNO, CA 93722 

(559) 432-8873  FAX (559) 432-3059 

www.m2inc.com  Email: [email protected] 

 

40M3L ASSEMBLY MANUAL 

Содержание 40M3L

Страница 1: ...nding performance that will deliver years of enjoyment on the 40 meter band Mechanically the elements are mounted between 1 2 thick machined aluminum clamp plates The Driven element is split and insul...

Страница 2: ...G ROD into a CLAMP PLATE ASSEMBLY Center the assembly and align the bolt holes to vertical Tighten all four outer element clamp plate bolts EVENLY Make sure plates remain parallel top to bottom 2 VERT...

Страница 3: ...sections into the swaged 1 sections and secure with 8 32 x 1 1 4 screws and locknuts NOW IS THE TIME TO DETERMINE WHAT PART OF THE BAND YOU WANT TO USE MOST AND EMPHASISE THE 3 BAND SEGMENTS INSURE V...

Страница 4: ...MENSION SHEET NOTE the dimension is measured from the OUTSIDE edge of the LL arm to the OUTSIDE edge of the shorting bar USING A BLACK PERMANENT MARKING PEN OR EQUIVALENT MARK THE SPOT ON THE ROD WHER...

Страница 5: ...n tubes INSERT the tubes into the grooved channels of 3 8 clamp block assemblies on Driven element Push the tubes through until at least 1 4 extends beyond clamp and then tighten the clamp bolt slight...

Страница 6: ...roops again following final adjustments check your knots They may be may be slipping D After final installation of the antenna the turnbuckle plate installed loosely with a 2 U bolt is raised up the m...

Страница 7: ...2 1 7 0 7 130 7 1 7 240 7 150 7 30 REFLECTOR 58 50 50 50 47 50 DRIVEN 44 50 37 50 34 50 DIRECTOR 39 50 31 50 28 50 S HAIRPIN SHORT 36 36 36 108 5 108 5 108 5 ON ALL EIGHT HALF ELEMENT SECTIONS 1 X 1...

Страница 8: ...POST 1 4 20 X 2 BOLT LOCKNUT DRIVEN ELEMENT HARDWARE 8 32 X 1 SCREW LOCKNUT 5 PER SIDE 1 1 4 X 24 FIBERGLASS ROD 1 3 8 X 23 13 16 SLEEVE 1 1 2 X 60 SOE 1 4 20 X 2 3 4 BOLT LOCKWASHER STRAIN RELIEF HPT...

Страница 9: ...8 CLAMP BLOCKS HAIRPIN TUBE 3 8 ALUM TUBE 2 1 1 BALUN AREA TOP VIEW HAIRPIN SHORTING BAR DETAIL END VIEW 3 8 X 1 SPACER 1 4 20 X 2 BOLT LOCKNUT BAND CLAMP 52 1 20 X 1 4 SET SCREW LINEAR LOADING HARDWA...

Страница 10: ...GENERIC COMPRESSION CLAMP DETAIL NOTE Generic layout to show how compression clamps work Your antenna may have one or the other or may even have both compression clamp sizes...

Страница 11: ...Element section 3 4 x 049 x 48 SOE 6 Element tip section 1 2 x 049 x 61 50 2 Element tip section 1 2 x 049 x 47 50 2 Element tip section 1 2 x 049 x 42 50 2 Hair pin tube 3 8 x 55 2 ALUMINUM ROD DESC...

Страница 12: ...stainless 14 Bolt 1 4 20 x 2 0 stainless 5 Set screws 1 4 20 x 1 4 ss 2 Nut 1 4 20 stainless 6 Nut 1 4 20 locking stainless 27 Allen wrench 1 8 1 BAG 9 5 8 Compression clamp 6 Screw 8 32 x 1 3 4 panhe...

Отзывы: