Step 8:
With the power on, the wash and rinse heating systems should be checked. The rinse tank
should take 5 to 10 minutes to reach 195 F and the wash should take approximately 60
minutes to reach 150 F. The times will vary depending on the temperature of the incoming
water.
Note:
The rinse manifold gauge measures the temperature of the rinse water just
before it enters the machine. Therefore this temperature reading is only accurate while the
machine is rinsing.
If the machine is not reaching temperature check to make sure that all the breakers in the
control panel are in the "ON" position. If the wash tank is gas heated make certain that main
gas valve and the gas valve in the control panel are open. During initial start-up gas machines
may have to be turned on and off several times to bleed the air out of the gas lines. Wait
about a minute after turning the machine off before turning it back on. If the machine still
does not appear to be heating up properly call LVO Manufacturing at 1-800-346-5749.
Step 9:
Adjust the pressure regulator (see location on pages 24 - 26). The pressure should be set at
20 psi on the rinse gauge
while the machine is rinsing
. Variations in building water pressure
may require the pressure to be increased or decreased from its factory setting.
Step 10:
If the machine is equipped with the 700 cfm fan option (see page 8 for a description of the
fan option) check to make sure that it is rotating in the correct direction. If the fan is
blowing into the machine rather than out the vent the two outside wires on the three phase fan
connection in the control panel need to be swapped. Recheck to confirm proper rotation.
Step 11:
Replace all covers and peel off the plastic protective coating and tape etc. from the machine
which may have been used to prepare the machine for shipping.