In its delivery state, the motor of the ball valve is connected in accordance
with the following plan.
1
2
3
1
3
2
11
13
14
12
1
2
3
PE
1
3
2
24
25
26
1
2
3
1
3
2
7
9
10
8
1
2
3
PE
1
3
2
21
22
23
1
2
3
Motor 1 (left)
Motor 2 (right)
Fig. 8: Motor connection
Position Description
1
Control circuit board
2
Large Stretcher on the Engines
3
Small stretcher on the Engines
Tab. 11: Motor connection
7.5 Completing the installation
Perform the following working steps:
1.
Tighten all cable screw connections to guarantee the IP protection
class of the installation.
2.
Check all connections for leak-tightness (see section 9 „Commis-
sioning“ on page 20).
3.
Touch up damaged paint.
i
All exposed bright metal surfaces must be painted as the
atmosphere in chlorine gas rooms is highly corrosive. A
suitable paint is e.g. 2-Component epoxy resin lacquer
RAL 1003 (yellow). Paint must only be applied after a
successful leak test has been completed.
ü
Installation completed.