Installation
14
© Lutz-Jesco GmbH 2021
BA-22404-02-V03
Chlorine changeover unit
C 7520
Operating instructions
Close the control housing
Perform the following working steps:
1.
Pivot the housing lid towards the housing floor.
2.
Pivot the hinge part towards the lid until it snaps in audibly.
3.
Press against the hinge part with your hand until it locks audibly in
place.
ü
Housing closed.
i
The changeover unit is ready for operation immediately after
connection of the supply voltage. The motors need only be
connected with devices without a mounting plate. The plugs
are already fitted to the cable and marked as follows:
No. 1: Left valve
No. 2: Right valve
i
Where required, the relay contacts for remote indication of the
operating state can be connected. The assignment and
function of the individual terminals can be taken from the
terminal connection plan.