8 seeTouch
®
guestroom solutions
Wallstation Installation (continued)
1. Mount wallbox with appropriate depth.
2. Strip 9 mm (3/8 in) insulation from both twisted
pairs in the wallbox.
Start-up Procedure
Check Load Circuits
1. Make sure the factory-installed bypass jumper(s) are still in place between the L (Live) and DL (Dimmer Load)
terminals. Replace panel cover. Turn circuit breaker on.
2. Check the input current to the L (Live) terminal with a “clamp-on” type current probe. The current probe
should measure no more than 8,75 A.
3. Turn loads ON for at least ten minutes. If circuit breaker trips, turn power OFF, then locate and correct miswire
or overload.
Check Panel
1. With power OFF, make sure all control wiring is correct. Replace panel cover. Turn circuit breaker on.
2. Push buttons on wallstation control. The lighting should go to full, but the control indicator lights should go
on/off.
Remove Bypass Jumpers
1. Turn power OFF.
2. Remove the load circuit bypass jumper from the control panel.
3. Turn power ON. Change the scene buttons on the Grafik Eye
®
QS to make sure they adjust the light level.
Содержание seeTouch guestroom solutions
Страница 2: ...2 seeTouch guestroom solutions...
Страница 16: ...seeTouch MCB PELV 230 V 50 60 Hz 8 75 A 40 350 W 24 V 200 mA...
Страница 17: ...seeTouch 3 seeTouch 24 V Lutron QS 3 4 5 6 7 8 9 10 11 12...
Страница 18: ...4 seeTouch 0 40 C 1 8 6 32 63 8 kg 337 22 286 80 8 235 235 191 25 337 74 86 mm PELV PELV...
Страница 19: ...seeTouch PELV 230 50 60 8 75 A 40 350 24 200...
Страница 20: ...seeTouch 3 seeTouch 24 QS Lutron 3 4 5 6 7 8 Ethernet 9 10 11 12...
Страница 21: ...4 seeTouch 0 40 C 1 8 Lutron 6 32 63 8 337 22 286 80 8 235 235 191 25 337 74 86 PELV PELV...