110
ALDE HEATING - QUICK START GUIDE
“Gas failure”
•
Out of gas or gas is not igniting.
•
Check the gas cylinder is full. Try a different
gas cylinder, ensuring it is propane gas.
“Overheat red fail” or “Overheat blue fail”
•
Bleed the system of air.
•
Check the fluid level in the expansion tank.
It should be 1 cm above Min mark when
cool.
•
Check the circulation pump is responding.
•
Wait 15 mins for the fluid to cool down.
“Overheat PCB”
•
Failsafe in boiler has triggered.
•
Check the fluid level in the expansion tank.
It should be 1 cm above the Min mark when
cool.
•
Check the boiler compartment is ventilated,
and that the vents are unobstructed. Do not
place stowage in the boiler compartment.
“Fan failure”
•
Combustion fan speed too low. Bearing
may be stiff after a period of disuse.
•
Automatically clears after 5 mins. Please try
again.
“Connection failure”
•
Loose connection between Alde control
panel and boiler.
•
Unplug cable at the control panel and boiler,
then carefully plug back in.
•
Check there is slack on the cable at the
control panel, but not excessive weight from
free-hanging/unmanaged cable.
“Window open”
•
Optional window sensor has triggered, gas
heating is suspended. Automatically clears
and gas heating resumes when window is
closed.
“Connection fail ext”
•
Break in comms between Alde control panel
and daisy-chained third party control panel.
•
Check the cable between the Alde control
panel and third party control panel.
“Low battery”
•
12 V supply to boiler has dropped below
10.5 V, possibly causing system brownout.
•
Automatically clears when 12 V supply
reaches 11 V.
“No match Heater/Panel”
•
Control panel is incompatible with boiler
PCB.
•
Check control panel part number. Control
panel 3020-013 is for 3020 A-series boiler,
3020-113 is for 3020 HE-series boiler.
If problems persist, please contact Alde, or
your dealer or installer.
For our frequently asked questions, or
download all instruction manuals, please
visit our web site at: www.alde.co.uk
Содержание 2016 Ariva
Страница 14: ...PREPARING FOR THE ROAD 14 Fig 6 Checking Left Right Friction Pads...
Страница 18: ...PREPARING FOR THE ROAD 18 Fig 5 Fig 6 Fig 9 Fig 8 Fig 7 Fig 10...
Страница 30: ...ON THE ROAD 30...
Страница 35: ...35 SERVICES SERVICES Water 36 Gas 43 Electricity 48...
Страница 50: ...SERVICES 50...
Страница 51: ...51 ELECTRICS ELECTRICS Power Control System 52 Lights 84 Battery 84 Use of Generators 85...
Страница 55: ...55 ELECTRICS 2 4 Control Panel Component Layout EC370 Digital Control Panel LCD graphic display...
Страница 73: ...73 ELECTRICS 2 5 Control Panel Component Layout EC360 Digital Control Panel LCD graphic display...
Страница 122: ...122 FLYSCREENS BLINDS ROOFLIGHTS Opening and closing the panoramic rooflight...
Страница 127: ...127 7 Fit the safety boards into position BUNK BEDS...
Страница 130: ...130...
Страница 131: ...131 AL KO CHASSIS TYRES AL KO CHASSIS TYRES Chassis 132 General Maintenance 133 Tyres 134...
Страница 136: ...GENERAL DATA 136 CLUBMAN DELTA...
Страница 137: ...137 GENERAL DATA CLUBMAN DELTA...
Страница 138: ...GENERAL DATA 138 CLUBMAN DELTA...
Страница 139: ...139 GENERAL DATA CLUBMAN DELTA...
Страница 140: ...GENERAL DATA 140 CLUBMAN DELTA...
Страница 141: ...141 GENERAL DATA CLUBMAN DELTA...
Страница 142: ...GENERAL DATA 142 ARIVA QUASAR STELLAR LEXON...
Страница 143: ...143 GENERAL DATA ARIVA QUASAR STELLAR LEXON...
Страница 144: ...GENERAL DATA 144 ARIVA QUASAR STELLAR LEXON...
Страница 145: ...145 GENERAL DATA ARIVA QUASAR STELLAR LEXON...
Страница 146: ...GENERAL DATA 146 ARIVA QUASAR STELLAR LEXON...
Страница 147: ...147 GENERAL DATA ARIVA QUASAR STELLAR LEXON...
Страница 154: ...GENERAL DATA 154...