5 |
P a g e
Step 2) Plugthesolenoidvalveintotheapplicableelectrical
outlet.Atthisstage,thefunctionalityofthesolenoidvalve
canbetestedbypressingthesolenoidtestbuttonlocatedon
theupperleftofthecircuitboard.Manuallydepressing(and
holding)thisbuttonwillcompletetheelectricalcircuitandwill
openthenormallyclosedsolenoidvalve.Youshouldbeableto
heartheactivationofthesolenoidvalveatthisstagetoensure
thevalveisfunctioningproperly(seeFig.4).
Step 3) MakesureyourUVcontrollerisunpluggedfromthe
powersource.Oncealltheseconnectionshavebeenmade,
affixthemaleIEPplugofthesolenoidmodulecableintothe
IEPportonthecontroller(seeFig.5),oranyotheravailable
IEPportsuchastheUVsensor,4-20mAmoduleorremote
alarmmodule.ItdoesnotmatterwhichIEPportanymodule
isattachedto,aslongastheyareattached.
OPERATION
Step 1) PlugtheBLACKCOMBcontrollerintothepower
sourceandmakesurethesolenoidmoduleisactivatedon
thecontroller.Duringthestart-upsequence,theSOLENOID
MODULEscreenwillindicatea“initialized”whenthemodule
isactivatedproperly(seeFig.6).
Figure 4
SolenoidTestButton
Figure 6
Solenoid
Activation
Screens
Sensor IEP
Installation
IEP
connection
BLACKCOMB
Controller
BLACKCOMB-HO
Controller
IEP
connection
IEP
connection
Figure 5
IEPconnection
IEP
Содержание BLACKCOMB
Страница 14: ...1 2 P a g e...
Страница 15: ...1 3 P a g e...