363-206-204
Operational Tests
Issue 9 October 1998 10-3
NOTE
:
The DDM-2000 OC-3 should be verified that it is clear of all alarms (that is,
only green LEDs are lighted) prior to and after completing this test.
Procedure With a Terminal
1. Issue the command
test-alm:md=all
(TEST ALARM). At the repeat
prompt, enter the desired number of times for this test to be performed.
NOTE
:
This test can be terminated at any time with the CANcel or DELete com-
mand.
NOTE
:
This test will cycle through the following at 4-second intervals:
■
No alarm
■
Critical (CR) alarm
■
Major (MJ) alarm
■
Minor (MN) alarm
■
No alarm.
2. Verify that both the audible and visual alarms are activated during this test.
3. Repeat the office alarm test. This time during each alarm cycle press the
alarm cutoff (ACO) pushbutton and verify that the audible alarms are
silenced.
Procedure Without a Terminal
NOTE
:
This procedure should be performed as described below. The circuit packs
should not be reseated until instructed to do so.
1. Unseat one service (position 1 through 7) low speed circuit pack.
2. Activated office alarms: MN visible, MN audible.
NOTE
:
Alarms will not be activated for the length of the alarm delay. The default
time is 2 seconds.
Содержание DDM-2000 OC-3
Страница 4: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Страница 9: ...363 206 204 Issue 9 October 1998 Lucent Technologies ...
Страница 10: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Страница 24: ...xxiv Issue 9 October 1998 363 206 204 ...
Страница 32: ...xxxii Issue 9 October 1998 363 206 204 ...
Страница 34: ...xxxiv Issue 9 October 1998 363 206 204 ...
Страница 58: ...1 ii Issue 9 October 1998 363 206 204 ...
Страница 74: ...2 iv Issue 9 October 1998 363 206 204 ...
Страница 143: ...363 206 204 Equipment and Rear Access Cable Installation Issue 9 October 1998 2 69 Figure 2 19 RJ 45 Plug and Face ...
Страница 144: ...2 70 Issue 9 October 1998 363 206 204 Equipment and Rear Access Cable Installation ...
Страница 192: ...3 46 Issue 9 October 1998 363 206 204 Equipment and Front Access Cable Installation ...
Страница 304: ...6 30 Issue 9 October 1998 363 206 204 Release 7 Installation Tests ...
Страница 330: ...7 24 Issue 9 October 1998 363 206 204 Release 8 Installation Tests ...
Страница 362: ...8 30 Issue 9 October 1998 363 206 204 Releases 9 and 11 Installation Tests Figure 8 2 DDM 2000 User Panel ...
Страница 395: ...363 206 204 Release 13 TARP Installation Tests Issue 9 October 1998 9 29 Figure 9 2 DDM 2000 User Panel ...
Страница 398: ...9 32 Issue 9 October 1998 363 206 204 Release 13 TARP Installation Tests ...
Страница 426: ...11 ii Issue 9 October 1998 363 206 204 ...
Страница 492: ...IN 14 Issue 9 October 1998 ...