7-16 Issue 9 October 1998
363-206-204
Release 8 Installation Tests
7. Release the loopbacks as follows:
a. Issue the command
rls-lpbk-t1
or
rls-lpbk-ec1
;
b. At the address prompt, enter
ls-all
c. At the execute prompt, enter
Y
d. Perform the
upd
command.
DS3 Verification Procedure
The activity in the following procedure is performed from the CO location. Perform
this procedure on all DS3 circuit packs installed.
1. At the CO, change the DS3 violation monitoring mode from VMR to VM by
entering the following command:
set-t3:all:md=cc;
2. Establish a remote login from the CO to the RT site, using the
rlgn-tid
command.
3. Change the violation monitoring mode from VMR to CC in the same man-
ner as at the CO (Step 1).
4. Perform a DS3 or EC-1 loopback on all DS3/EC-1 groups at the RT by issu-
ing the following command:
a. Issue the command
opr-lpbk-t3
or
opr-lpbk-ec1;
b. At the address prompt, enter
fn-all
c. At the execute prompt, enter
Y
d. Verify that loopbacks are present by entering
rtrv-alm
5. At the CO, perform a DS3 test as follows:
a. Issue the
toggle
command to return CIT communications to the
CO shelf
b. Issue the command
test-trmsn-t
3
c. At the address prompt, enter
‘a’
or the appropriate address corre-
sponding to the loopback at the far-end.
d. At the direction prompt, enter
mux
e. At the duration prompt, enter
1
NOTE
:
This command will initiate a 1-minute DS3 transmission test from the CO
shelf to the RT shelf and looped back to the CO shelf.
6. If transmission is not error-free, isolate and correct the problem by checking
DS3 circuit packs and associated cabling.
Содержание DDM-2000 OC-3
Страница 4: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Страница 9: ...363 206 204 Issue 9 October 1998 Lucent Technologies ...
Страница 10: ...Issue 9 October 1998 363 206 204 Lucent Technologies ...
Страница 24: ...xxiv Issue 9 October 1998 363 206 204 ...
Страница 32: ...xxxii Issue 9 October 1998 363 206 204 ...
Страница 34: ...xxxiv Issue 9 October 1998 363 206 204 ...
Страница 58: ...1 ii Issue 9 October 1998 363 206 204 ...
Страница 74: ...2 iv Issue 9 October 1998 363 206 204 ...
Страница 143: ...363 206 204 Equipment and Rear Access Cable Installation Issue 9 October 1998 2 69 Figure 2 19 RJ 45 Plug and Face ...
Страница 144: ...2 70 Issue 9 October 1998 363 206 204 Equipment and Rear Access Cable Installation ...
Страница 192: ...3 46 Issue 9 October 1998 363 206 204 Equipment and Front Access Cable Installation ...
Страница 304: ...6 30 Issue 9 October 1998 363 206 204 Release 7 Installation Tests ...
Страница 330: ...7 24 Issue 9 October 1998 363 206 204 Release 8 Installation Tests ...
Страница 362: ...8 30 Issue 9 October 1998 363 206 204 Releases 9 and 11 Installation Tests Figure 8 2 DDM 2000 User Panel ...
Страница 395: ...363 206 204 Release 13 TARP Installation Tests Issue 9 October 1998 9 29 Figure 9 2 DDM 2000 User Panel ...
Страница 398: ...9 32 Issue 9 October 1998 363 206 204 Release 13 TARP Installation Tests ...
Страница 426: ...11 ii Issue 9 October 1998 363 206 204 ...
Страница 492: ...IN 14 Issue 9 October 1998 ...