TAD-100
234-151-022
LT
3
of
1
Page
2002
May
4,
Issue
Philosophy
Maintenance
GENERAL
extended
an
is
there
if
organizations
support
and
personnel
operations
local
aids
volume
This
with
link
communication
A
generators).
emergency
and
commercial
(both
power
ac
of
loss
is
document
The
outage.
entire
the
during
maintained
be
not
may
or
may
organizations
support
determine
to
used
when and how
processing
call
maximize
to
equipment
4ESS
the
down
shut
to
in
result
also
procedures
these
of
Use
minimum.
a
to
time
restoral
office
keeping
while
capability
volt
+24
and
volt,
-48
volt,
+140
the
in
damage
cell
no
and
replacement
plug-in
low
extremely
plants.
battery
-48
by
powered
are
which
XTSI
and
SCS
as
such
equipment
4ESS
new
of
introduction
the
With
no
is
it
volts,
-48
the
providing
plants
power
dual
of
use
the
and
volts
+140
than
rather
volts
4ESS
the
"simplexing"
by
outage
power
ac
an
during
life
battery
extend
to
try
to
practical
longer
+140
and
volts
-48
the
both
monitor
to
be
will
procedure
the
outage,
power
ac
an
During
office.
equipment
4ESS
associated
their
voltage,
operating
minimum
the
reaches
either
when
and
volts
will
configuration
office
particular
the
since
monitored
be
must
plants
Both
down.
powered
be
will
volt
+24
a
has
also
office
an
If
first.
voltage
minimum
reach
will
plant
battery
which
determine
more
be
will
there
and
small
is
drain
volt
+24
the
since
monitored,
be
not
need
it
plant,
battery
volts.
+140
or
volts
-48
the
either
for
than
volts
+24
the
for
time
reserve
PREPARATION
INITIAL
"dry
and
procedures,
the
with
familiar
become
personnel
office
all
document,
this
receiving
Upon
office.
individual
the
of
layout
plant
power
the
with
them
familiarize
to
initiated
are
runs"
EVENTS
OF
SEQUENCE
shown.
order
the
in
done
are
things
following
the
lost,
is
power
ac
When
IMPORTANT:
any
At
started.
are
procedures
restoral
and
discontinued
are
steps
these
restored,
is
power
ac
that
time
voltages.
battery
V
-48
and
V
+140
Monitor
1.
power
voltage,
operating
minimum
reach
voltages
battery
V
-48
or
V
+140
the
either
When
2.
reversal.
battery
prevent
to
appropriate
as
frames,
processor
and/or
peripheral
down
plants.
converter
all
down
Power
3.
switches.
power
frame
by
controlled
not
converters
all
down
Power
4.
Содержание 4ESS
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 14: ......
Страница 22: ......
Страница 26: ......
Страница 40: ......
Страница 44: ......
Страница 48: ......
Страница 50: ......
Страница 68: ......
Страница 70: ......
Страница 72: ......
Страница 74: ......
Страница 78: ......
Страница 80: ......
Страница 84: ......
Страница 86: ......
Страница 88: ......
Страница 90: ......
Страница 92: ......
Страница 96: ......
Страница 102: ......
Страница 104: ......
Страница 112: ......
Страница 114: ......
Страница 116: ......
Страница 118: ......
Страница 122: ......
Страница 126: ......
Страница 146: ......
Страница 148: ......
Страница 150: ......
Страница 152: ......