background image

234-151-022

LT

DLP-502

2002

May

4,

Issue

1

of

2

Page

the

rotate

down,

powered

be

to

frame

for

switch

power

1

ALC

At

11.

ROS/OFF switch

the

to

clockwise

ROS position.

the

press

down,

powered

be

to

frame

for

switch

power

1

ALC

At

12.

ROS/OFF pushbutton.

13.

PROCEDURE.

THIS

COMPLETED

HAVE

YOU

STOP!

Содержание 4ESS

Страница 1: ...4ESS Switch of Loss After Procedures Office Power AC 234 151 022 4 Issue 2002 May Copyright 2002 Lucent Technologies All Rights Reserved Printed in U S A...

Страница 2: ...ods following the a Employees Technologies Lucent Lucent the from available 1 80 80 IND Form fax or Mail number fax or address following the using by Organization Learning Note information billing req...

Страница 3: ...procedures tutorials step by step more Add organization the Improve information troubleshooting more Add figures more Include technical less it Make examples more Add aids reference quick more better...

Страница 4: ......

Страница 5: ...IST INDEX TASK TO GO THEN BELOW LIST THE IN JOB YOUR FIND NTP 002 Acceptance TAD 100 Philosophy Maintenance TAP 101 Power AC of Loss After System Maintain 4ESS the to Power Restore NTP 004 System Swit...

Страница 6: ......

Страница 7: ...NTP 002 234 151 022 LT 1 of 1 Page 2002 May 4 Issue Acceptance procedures acceptance no requires document This...

Страница 8: ......

Страница 9: ...s System obtain to 108 2 change recent restrict to commands following the Enter enter terminal MCC Processor 1B At 801 RC RESTRICT 801 white on black colored R e s p o n s e ROP MTC Processor 1B At MO...

Страница 10: ...n 1B Page Display 1990 MCC Processor 16 through 9 Steps perform to go mode SUSPEND the in put been has Processor 1B the if otherwise 17 Step 8 the set 0 Cabinet Processor 1B of back the At UAS to swit...

Страница 11: ...3Us controllers A link 1 and 0 controllers XTSI all down Power fans and 1 and 0 IPUBs SPUs DLP 508 24 1 and 0 controllers SCS all down power SCS an contains office the If AAP and CDSU contains office...

Страница 12: ...40 Steps perform to go mode SUSPEND the in put been has Processor 1B the if otherwise 48 Step 39 the set 0 Cabinet Processor 1B of back the At UAS to switch ALW UTIL position 40 the set 1 Cabinet Pro...

Страница 13: ...fuses 48 DLP 517 49 cabinet Processor 1B the down Power DLP 518 50 1 and 0 APIs down Power DLP 519 51 1 and 0 IPUBs and IO IOPs equipped all down Power CABINETS RING CNI FROM POWER REMOVING DLP 520 5...

Страница 14: ......

Страница 15: ...office your If 8 Step to go otherwise 7 through 3 Steps perform down powered were 2 620A the to power restore plant power type 620A contains office your If plant power DLP 513 3 620C the to power rest...

Страница 16: ...e rotate and up Power ROS OFF the in position normal the to switches verify then frame NCLK DLP 528 16 the rotate and up Power ROS OFF the in position normal the to switches frames SP DLP 529 17 the r...

Страница 17: ...tore cabinet APS 3B21D the from removed was power If configure and cabinet APS 3B21D DLP 541 29 CABINETS RING CNI THE TO POWER RESTORING DLP 526 30 cabinets Ring CNI the to power Restore OPERATION SYS...

Страница 18: ...terminal MCC Processor 1B At 106 and Status MUP the obtain to 106 Page Control 44 enter terminal MCC Processor 1B At 612 inhibit to ALW NON INTF UAS mode interfering Response ALW NON INTF UAS 612 blac...

Страница 19: ...ac an During office equipment 4ESS associated their voltage operating minimum the reaches either when and volts will configuration office particular the since monitored be must plants Both down power...

Страница 20: ...ESS the in packs circuit and converters of loss Massive 1 are breakers circuit plant power the after power restore to followed are procedures proper If 2 tripped ALL switch 4ESS entire the in removed...

Страница 21: ...sed is A Table 2 A m b i e n t E q u i p m e n t O f f i c e C e n t r a l T e l e p h o n e R e q u i r e m e n t s H u m i d i t y a n d T e m p e r a t u r e more not of total a and hours consecuti...

Страница 22: ......

Страница 23: ...r on Reports ac time any At system and stopped be should procedures these restored is power NTP 004 using started restoral operation in be will generators when time estimated the out find and group po...

Страница 24: ...TOSL List Out of Service Trunk Tape Generic APS 3B Tape DB 3B tape TOP to group support higher next your notify current not are tapes backup your If action of course determine longer or minutes 20 for...

Страница 25: ...1 Bay of 1 Figure per fuse AOC the to DVM the on lead plus the Connect 2 mounting the or punching ground a either to DVM the on lead common the Connect 3 1 Figure per plate of front the from read easi...

Страница 26: ......

Страница 27: ...cessor 1B At 2 in is API which STBY state ground to shorts avoid to care Use present is dc volts 48 Warning terminal the to DVM one of lead plus the connect frame API standby the of back the At 3 stri...

Страница 28: ...234 151 022 LT DLP 501 2002 May 4 Issue 2 of 2 Page volts 52 08 to 42 75 between reads DVM the that Check 7 reference for reading DVM the Record 8 9 PROCEDURE THIS COMPLETED HAVE YOU STOP...

Страница 29: ...or switch power 0 Controller At 4 ROS OFF pushbutton the rotate down powered be to frame for switch power 0 ALC At 5 ROS OFF switch the to clockwise ROS position the press down powered be to frame for...

Страница 30: ...f 2 Page the rotate down powered be to frame for switch power 1 ALC At 11 ROS OFF switch the to clockwise ROS position the press down powered be to frame for switch power 1 ALC At 12 ROS OFF pushbutto...

Страница 31: ...wered be to frame for switch power ROS OFF pushbutton the rotate down powered be to frame for switch power 0 Controller At 5 ROS OFF switch the to clockwise ROS position the press down powered be to f...

Страница 32: ...e the rotate down powered be to frame for switch power 1 Controller At 11 ROS OFF switch the to clockwise ROS position the press down powered be to frame for switch power 1 Controller At 12 ROS OFF pu...

Страница 33: ...osition the press down powered be to frame DIF DIF E1 for switch power 0 Controller At 4 ROS OFF pushbutton the rotate down powered be to frame DIF DIF E1 for switch power 1 IPUB At 5 ROS OFF the to c...

Страница 34: ...234 151 022 LT DLP 504 2002 May 4 Issue 2 of 2 Page down powered been frames DIF DIF E1 all Have 11 If Yes 12 Step to go If No 1 Step from repeat 12 PROCEDURE THIS COMPLETED HAVE YOU STOP...

Страница 35: ...ROS position the press down powered be to frame VIF for switch power 0 Controller At 4 ROS OFF pushbutton the rotate down powered be to frame VIF for switch power 1 IPUB At 5 ROS OFF switch the to cl...

Страница 36: ...234 151 022 LT DLP 505 2002 May 4 Issue 2 of 2 Page down powered been frames VIF all Have 11 If Yes 12 Step to go If No 1 Step from repeat 12 PROCEDURE THIS COMPLETED HAVE YOU STOP...

Страница 37: ...position the press down powered be to frame EST for switch power 0 Controller At 4 ROS OFF pushbutton the rotate down powered be to frame EST for switch power 1 IPUB At 5 ROS OFF switch the to clockw...

Страница 38: ...234 151 022 LT DLP 506 2002 May 4 Issue 2 of 2 Page down powered been frames EST all Have 11 If Yes 12 Step to go If No 1 Step from repeat 12 PROCEDURE THIS COMPLETED HAVE YOU STOP...

Страница 39: ...wer 0 Controller At 1 0 C0 CONTR PWR pushbutton the press down powered be to frame DT for switch power 1 Controller At 2 1 C1 CONTR PWR pushbutton the press DTU equipped one At 3 U 0 8 pushbutton PWR...

Страница 40: ......

Страница 41: ...ep in determined switch power the At 2 the ROS NORM the to switch ROS position the press simultaneously down powered be to cabinet XTSI for switch power the At 3 OFF and MOR pushbuttons down powered b...

Страница 42: ...to go If No SPU equipped next the for 9 Step from repeat IBU an with equipped XTSI this Is 12 If Yes 13 Step to go If No 15 Step to go the operate 14 148 EQL switch power IBU equipped the At 13 ROS NO...

Страница 43: ...TSI the At 16 removed been B Table in listed fuses the all Have 17 If Yes 5 Step to go If No fuse next the for 15 Step from repeat down powered been office this in XTSIs equipped the all Have 18 If Ye...

Страница 44: ......

Страница 45: ...ives hard any down power not Do cabinet SCS0 an in 0 Controller of packs circuit IPUB TN1671 and CONTR TN1984 At 2 the press simultaneously 1 Step OFF and MOR pushbuttons cabinet 0 SCS an in 1 Control...

Страница 46: ...If Yes 12 Step to go If No cabinet SCS next the for 5 Step from repeat down powered been office this in numbers member SCS the all Have 12 If Yes 13 Step to go If No number member SCS next the for 1 S...

Страница 47: ...T 3 of 3 Page 2002 May 4 Issue Note appear to message this for minutes several take may It message the When 20 down is System the to knob control SP each turn appears Off position 21 PROCEDURE THIS CO...

Страница 48: ......

Страница 49: ...power ROS OFF the to clockwise switch ROS position At 2 0 PUB the press frame 0 PUBB the in switch power ROS OFF pushbutton At 3 1 PUB the rotate frame 0 PUBB the in switch power ROS OFF the to clockw...

Страница 50: ......

Страница 51: ...pushbutton the rotate 2 80 43 EQL frame 2 SP in switch power 1 IPUB At 6 ROS OFF switch the to clockwise ROS position the press frame 2 SP in switch power 1 IPUB At 7 ROS OFF pushbutton the rotate 2 4...

Страница 52: ...er 0 IPUB At 15 ROS OFF pushbutton the rotate B Table see frame 1 SP in switch power 0 Controller At 16 ROS OFF switch the to clockwise ROS position Controller B Table Location Switch 0 48 02 or SD 4A...

Страница 53: ...switch ROS position At 24 PPL the press frame Applique Distributor 1 SP in 0 52 69 EQL switch power ROS OFF pushbutton SD 4A046 01 Matrix Scanner and Distributor a with equipped frame 1 SP Is 25 If Y...

Страница 54: ...e to clockwise switch ROS position At 32 PPR Matrix Scanner and Distributor Combined 1 SP in 5 22 65 EQL switch power the press frame ROS OFF pushbutton the On Warning 98A2 the set to out switch toggl...

Страница 55: ...the to ROS position At 6 0 NCSU the press frame clock network the in switch power ROS OFF pushbutton At 7 1 IPUB the rotate frame clock network the in switch power ROS OFF clockwise switch the to ROS...

Страница 56: ...per down power being oscillators DROs each for fuses volt 48 Remove 14 A Table Fuse SD 4A014 02 Oscillator Clock Location Fuses Location Chain 007 11 DC 033 21 0 007 59 DD 033 56 1 107 11 DC 133 21 2...

Страница 57: ...tion trips breaker circuit Associated Response OFF down powered been plant power this in converters all Have 3 If Yes 7 Step to go If No converter next the for 2 Step from repeat the set and converter...

Страница 58: ...CONV3 OFF ON CONV3 OFF ON CONV4 CONV4 OFF ON OFF CONV2 CONV2 CONV1 CONV1 OFF ON OFF ON ON OFF OFF ON ON FUSE A BUS FUSE TO RIGHT CIRCUIT A BUS CLOSE BREAKERS CIRCUIT CLOSE BREAKERS B BUS TO LEFT BAT...

Страница 59: ...per position 1 Figure down powered been plant power this in converters all Have 3 If Yes 7 Step to go If No converter next the for 2 Step from repeat the set frame the of top the at panel the on and u...

Страница 60: ...022 LT DLP 514 2002 May 4 Issue 2 of 2 Page 1 2 3 4 5 6 7 CONVERTER 1 2 3 4 5 6 7 CONVERTER CIRCUIT BREAKERS 1 THROUGH 7 ON STANDBY ALL 7 CONVERTERS SWITCH TYPICAL OF View Front Plant Power 620C 625C...

Страница 61: ...ect 2 ON OFF the to switch OFF 1 Figure per position trips breaker circuit Associated Response OFF down powered been plant power this in converters all Have 3 If Yes 7 Step to go If No converter next...

Страница 62: ...22 LT DLP 515 2002 May 4 Issue 2 of 2 Page up powered been plant power this in converters all Have 6 If Yes 7 Step to go If No converter next the for 4 Step from repeat 7 PROCEDURE THIS COMPLETED HAVE...

Страница 63: ...owering 5 Step to go If down powering 2 Step to go the set down powered be to converters all On 2 OUTPUT the to switch OFF per position 1 Figure the set down powered be to converters all On 3 INPUT th...

Страница 64: ...ue 2 of 2 Page the set up powered be to converters all On 5 INPUT the to switch ON 1 Figure per position the set up powered be to converters all On 6 OUTPUT the to switch ON per position 1 Figure 7 PR...

Страница 65: ...first cabinet OOS the with starting down powered A Table Location Pack 58 086 MUP 58 120 AUI 58 168 SSD 41 014 CC 24 086 0 CSB 24 096 1 CSB the operate cabinet Processor 1B the in 3 Step in determined...

Страница 66: ...e 58 030 EQL switch power XPWR At 13 ROS NORM the to switch ROS position the press simultaneously switch power XPWR the At 14 OFF and MOR pushbuttons being cabinet Processor 1B in fan one for fuses of...

Страница 67: ...22 LT 3 of 3 Page 2002 May 4 Issue down powered been 1 and 0 cabinets Processor 1B Have 18 If Yes 19 Step to go If No cabinet Processor 1B suspended the for 3 Step from repeat 19 PROCEDURE THIS COMPLE...

Страница 68: ......

Страница 69: ...switch power At 1 ROS OFF the to clockwise switch ROS position the press frame 0 API the in switch power At 2 ROS OFF pushbutton the rotate frame 1 API the in switch power At 3 ROS OFF the to clockwi...

Страница 70: ......

Страница 71: ...IOP in switch power 0 IOUS At 4 ROS OFF pushbutton the rotate frame IO IOP in switch power 1 IPUB At 5 ROS OFF the to clockwise switch ROS position the press frame IO IOP in switch power 1 IPUB At 6...

Страница 72: ......

Страница 73: ...unseat cabinet Node Ring CNI one At 1 yet packs circuit converter power the cabinet Node Ring CNI this in shelves all for 1 Step Repeat 2 cabinet Node Ring CNI this in packs circuit converter power th...

Страница 74: ......

Страница 75: ...For 1 or 0 side for switch power unit one of location determine A Table Using 3 A Table Location 1 Side Location 0 Side 45 080 1 IOP 19 080 0 IOP 53 060 1 CU 28 060 0 CU 53 178 1 DFC 28 178 0 DFC the...

Страница 76: ...press and release then position MOR pushbutton pack circuit MHD the Unlatch 10 down spin to MHD the allow to minute 1 Wait 11 MHD the Unseat 12 down powered been side one for MHDs equipped the all Hav...

Страница 77: ...le Using 19 C Table Location Fuse Fan 69 023 B A 69 032 B B 69 041 B C 69 159 B E 69 168 B F 69 177 B G 19 Step in determined fuse the remove panel fuse cabinet APS 3B21D the At 20 removed been C Tabl...

Страница 78: ......

Страница 79: ...39 176 B 31 176 C pack circuit the unseat 1 Step in determined unit power one At 2 cabinet shelf from pack circuit unit power the remove not Do down powered been A Table in units power the all Have 3...

Страница 80: ......

Страница 81: ...41 B and 39AC 031 B 5 039AC 041 C and 39AC 031 C 6 1 Step in determined fuses the install cabinet Processor 1B a in panel fuse the At 2 installed been A Table in listed fuses the all Have 3 If Yes 4 S...

Страница 82: ...on the operate switch power PS the At 10 ROS NORM the to switch NORM position up powered been PSs equipped the all Have 11 If Yes 12 Step to go If No PS equipped next the for 9 Step from repeat the pr...

Страница 83: ...1B At 17 613 mode interfering allow to ALW INTF UAS the Under Response MODE UAS field INTERFERING UAS red on white colored is enter terminal MCC Processor 1B At 18 1990 1990 Page Start Dead the obtain...

Страница 84: ......

Страница 85: ...1 ON pushbutton the rotate frame 0 API the in switch power At 2 ROS OFF the to counter clockwise switch position normal the press frame 1 API the in switch power At 3 ON pushbutton the rotate frame 1...

Страница 86: ......

Страница 87: ...ockwise switch position normal the the press frame IO IOP in switch power 1 IPUB At 5 ON pushbutton the rotate frame IO IOP in switch power 1 IPUB At 6 ROS OFF to counter clockwise switch position nor...

Страница 88: ......

Страница 89: ...t fan each At 1 ON switch cabinet Node Ring CNI this in packs circuit converter power the of all Seat 2 cabinet Node Ring CNI this in shelf one on packs circuit the of all Seat 3 cabinet Node Ring CNI...

Страница 90: ......

Страница 91: ...button At 2 0 PUB the rotate frame 0 PUBB the in switch power ROS OFF counter switch position normal the to clockwise At 3 1 PUB the press frame 0 PUBB the in switch power ON pushbutton At 4 1 PUB the...

Страница 92: ......

Страница 93: ...me clock network the in switch power ROS OFF counter switch position normal the to clockwise At 7 1 IPUB the press frame clock network the in switch power ON pushbutton At 8 1 IPUB the rotate frame cl...

Страница 94: ...s switch DISABLE the at connected cable the disconnect rewritten be to DRO the At 19 INPUT OUTPUT D A J20 jack to ED 4A178 Unit Adjustment Manual Oscillator an Connect 20 J20 INPUT OUTPUT D A jack lig...

Страница 95: ...e disconnect DRO the At 27 D A J20 INPUT OUTPUT jack the to cable DRO the connect DRO the At 28 J20 INPUT OUTPUT D A jack the Has 29 WORD WRITE OSC 3 through 0 DROs for verified been display If Yes 30...

Страница 96: ......

Страница 97: ...h power 0 IPUB At 5 ROS OFF counter switch position normal the to clockwise the press 1 46 03 EQL frame 2 SP in switch power 0 Controller At 6 ON pushbutton the rotate 1 46 03 EQL frame 2 SP in switch...

Страница 98: ...switch ON position the press A Table see frame 1 SP in switch power 0 IPUB At 16 ON the rotate pushbutton ROS OFF position normal the to counter clockwise switch IPUB A Table Location Switch 0 80 29 o...

Страница 99: ...3 Bay the rotate frame 1 SP in switch power 1 Controller At 23 ROS OFF counter clockwise switch position normal the to SD 4A047 01 Applique Distributor a with equipped frame 1 SP Is 24 If Yes 25 Step...

Страница 100: ...r the press frame ON pushbutton At 32 PPL Matrix Scanner and Distributor Combined 1 SP in 1 22 65 EQL switch power the rotate frame ROS OFF position normal the to counter clockwise switch At 33 PPR Ma...

Страница 101: ...ate up powered be to frame for switch power 0 Controller At 6 ROS OFF switch position normal the to counter clockwise At 7 C0IPUB1 the press up powered be to frame for switch power ON pushbutton At 8...

Страница 102: ......

Страница 103: ...0 Warning DVM the off turn frame TSI B number member lowest the in 1 Bay of rear the At 1 1 Figure per fuse AOC the from DVM the on lead plus the Disconnect 2 the or punching ground a either from DVM...

Страница 104: ......

Страница 105: ...ise the press up powered be to frame for switch power 0 ALC At 6 ON pushbutton the rotate up powered be to frame for switch power 0 ALC At 7 ROS OFF counter switch position normal the to clockwise the...

Страница 106: ...234 151 022 LT DLP 532 2002 May 4 Issue 2 of 2 Page up powered been frames TSI equipped all Have 14 If Yes 15 Step to go If No 1 Step to go 15 PROCEDURE THIS COMPLETED HAVE YOU STOP...

Страница 107: ...pushbutton the rotate up powered be to frame DIF DIF E1 for switch power 0 Controller At 5 ROS OFF position normal the to counter clockwise switch the press up powered be to frame DIF DIF E1 for swit...

Страница 108: ...234 151 022 LT DLP 533 2002 May 4 Issue 2 of 2 Page up powered been frames DIF DIF E1 all Have 12 If Yes 13 Step to go If No 1 Step from repeat 13 PROCEDURE THIS COMPLETED HAVE YOU STOP...

Страница 109: ...XTSI the At 2 installed been A Table in listed fuses the all Have 3 If Yes 4 Step to go If No fuse next the for 1 Step from repeat up powered be to XTSI the in switch power one of location determine B...

Страница 110: ...next the for 8 Step from repeat SPUs with equipped XTSI this Is 11 If Yes 12 Step to go If No 15 Step to go the press switch power SPU equipped one At 12 ON pushbutton the operate switch power SPU th...

Страница 111: ...1 022 LT 3 of 3 Page 2002 May 4 Issue up powered been office this in XTSIs equipped the all Have 18 If Yes 19 Step to go If No XTSI equipped next the for 1 Step from repeat 19 PROCEDURE THIS COMPLETED...

Страница 112: ......

Страница 113: ...ntroller At 5 ROS OFF switch position normal the to counter clockwise the press up powered be to frame EST for switch power 1 IPUB At 6 ON pushbutton the rotate up powered be to frame EST for switch p...

Страница 114: ......

Страница 115: ...0 Controller At 5 ROS OFF switch position normal the to counter clockwise the press up powered be to frame VIF for switch power 1 IPUB At 6 ON pushbutton the rotate up powered be to frame VIF for swit...

Страница 116: ......

Страница 117: ...wered be to frame DT for switch power 0 Controller At 2 PWR 0 C0 CONTR pushbutton the press up powered be to frame DT for switch power 1 Controller At 3 PWR 1 C1 CONTR pushbutton the press DTU equippe...

Страница 118: ......

Страница 119: ...d Contr is TN1984 the to knobs SP both setting by AAP the up Power 1 On position CDSU2s and CDSU1s both CDSUs the up Power 2 up is system message the for terminal console AAP the Observe 3 Note consol...

Страница 120: ...cabinet this in units the all Have 11 If Yes 12 Step to go If No cabinet the in unit each for 9 Step from repeat the press switch power drive hard UN356 a At 12 ON pushbutton up powered been cabinet...

Страница 121: ...and 3 Fan unit power one of location the determine A Table Using 2 A Table Location Unit 39 020 A 39 176 B 31 176 C pack circuit the seat 2 Step in determined unit power one At 3 up powered been A Tab...

Страница 122: ......

Страница 123: ...essor 1B At 3 1x where x 1 or 0 purple on black colored CC the is the clear to FNCT FORCE section white on purple colored now are commands poke selected The Response enter terminal MCC Processor 1B At...

Страница 124: ...nse PC AUTO DIS 70 purple on black colored Enter 13 84 RECV MODIFY Response RECV MODIFY 84 white on purple colored Enter 14 53 3 PHASE Response 3 PHASE 53 white on purple colored Enter 15 89 DISPLAY C...

Страница 125: ...Enter 19 402 ALL RESET All Response ASSIGNMENTS KEY DDI ACTIONS RECOVERY MODIFY white colored black on Enter 20 401 16 17 24 Response 24 17 16 ASSIGNMENTS KEY DDI ACTIONS RECOVERY MODIFY white on blac...

Страница 126: ......

Страница 127: ...binet APS 3B21D the At 2 installed been A Table in listed fuses the all Have 3 If Yes 4 Step to go If No fuse next the for 1 Step from repeat reset the toggle 36 008 EQL panel switch fan the on APS 3B...

Страница 128: ...22 162 0 MHD 19 170 2 MHD 11 164 4 MHD 11 180 6 MHD 45 170 3 MHD 53 162 1 MHD 62 164 5 MHD 62 180 7 MHD 9 Step in determined MHD the Seat 10 the press momentarily 9 Step in determined MHD the At 11 S...

Страница 129: ...At 20 ST ON OFF to switch ST release then position the operate 53 060 EQL switch power 1 CU APS 3B21D At 21 ROS RST the to switch RST position the press MCRT APS 3B21D At 22 DISP EA page display EAI t...

Страница 130: ...nal or failing is attempt SUCCESS PRMs Successful Ex41 0 PRM 3B21D the Monitor Note PRMs application and RTR passing for Check stable is system until ROP 3B21D the at message following the of presence...

Страница 131: ...in ACT is 1 MTTYC If 42 ACT command poke enter 241 to 1 MTTYC take to mode command in OOS enter MCRT 3B21D the At 43 EXC ENVIR UPROC FN tools 3b21 dl tool ARGS SCC 1 OOS to link 1 SCC the grow to OOS...

Страница 132: ...SCRIPT tools 3b21 dl tool THE USING 1 SCC OF GROWTH BEGINNING 09 002300 16 09 18 01 30 02 STATE GROWTH IN 1 SCC REPT 09 M 002306 16 09 38 01 30 02 PROGRESS IN 1 SCC GROWTH REPT 09 002308 16 09 39 01 3...

Страница 133: ...line 0 CU force to mode command in Enter 10 y force 0 CU the confirm to mode command in Enter 11 54 APS 3B21D the boot to mode command in Enter 12 y boot the confirm to more or One RECOVERY CU OF STAR...

Страница 134: ...r indication fail boot a for Wait 6 Was 7 CU RCVRY a COMPLETED was boot APS 3B21D received response successful If Yes 16 Step to go If No 15 Step to go until proceed not Do organization support higher...

Страница 135: ...roper Is 3 If Yes 4 Step to go If No 7 Step to go depress displayed not is Page EAI the if terminal MCC Processor 1B At 4 DISP EA key enter terminal MCC Processor 1B At 5 61 FILE NORM Response FILE NO...

Страница 136: ...o Note in 16 Step During DISPLAY DATA FAIL EAI aaa digits octal section the in 1 Figure see bbbbb and CODE 86 incrementing begin must field entering after seconds 10 within 01 1B the that indicates bb...

Страница 137: ...C different 6 Page 45 Step to Go the in 23 bit digit leftmost fourth the while phase the During 19 DISPLAY DATA FAIL EAI CODE 86 4 and 0 between go to continues field DATA 87 and ADDR 88 must fields c...

Страница 138: ...quired be will I O restore to Attempt I O without recovered System 27 Step at Continue 28 is terminal MCC Processor 1B At 28 RECV MODIFY 84 black on white colored If Yes 30 Step to go If No 29 Step to...

Страница 139: ...38 0 DPLXFAIL CLR APS message Enter 39 899 OP OOSUNITS Enter 40 813 INH INTRPT Depress 41 DISP EA page EAI the obtain to key successfully up came system the if determine to 40 through 37 Steps printou...

Страница 140: ...1 CC Response 1 CC 11 white on purple colored is Enter 49 89 DISPLAY CLEAR Response DISPLAY DATA FAIL EAI cleared is section Enter 50 01 file UPDATE the from Processor 1B the of boot a initiate to A...

Страница 141: ...54 CMPL PROGRESSION PC green on black to color change If Yes 55 Step to go If No 56 Step to go Note fourth the terminal MCC Processor 1B the at initiated is 3 phase a When the in digit leftmost CODE 8...

Страница 142: ...SREC1 and or SCC MTC 1B Is 61 If Yes 62 Step to go If No 65 Step to go service a Ensure successfully up came system the if determine to printouts the Evaluate 62 exist not does condition degrading suc...

Страница 143: ...e colored is messages outputting SREC1 and or SCC MTC 1B Is 72 If Yes 74 Step to go If No 73 Step to go until proceed not Do organization support higher next contact and procedure this Stop 73 APS 3B2...

Страница 144: ...d TOP in instructions Procedure Recovery Emergency Office the use necessary be may 234 351 002 enter terminal MCC Processor 1B At 83 1x 1 or 0 purple on black colored CC the is x where All Response FN...

Страница 145: ...1B At 88 displayed was 61 If UPD COMMIT NORMFILE displayed was 62 If UPD COMMIT UPDFILE enter terminal MCC Processor 1B At 89 108 108 Page Status System the obtain to Enter 90 801 changes recent rest...

Страница 146: ......

Страница 147: ...hh 59 to 00 Minute mm Note hours The minute the on minute every made are announcements Time Time Mean Greenwich in are announced the for listen and 303 499 7111 at Announcement Time Standards of Burea...

Страница 148: ......

Страница 149: ...Table Fuse SD 4A014 02 Oscillator Clock Location Fuses Location Chain 007 11 DC 033 21 0 007 59 DD 033 56 1 107 11 DC 133 21 2 107 59 DD 133 56 3 1 Step in determined fuses the install frame Clock Net...

Страница 150: ......

Страница 151: ...3 TAD 100 DLP 534 TAP 101 DLP 535 DLP 500 DLP 536 DLP 501 DLP 537 DLP 502 DLP 538 DLP 503 DLP 539 DLP 504 DLP 540 DLP 505 DLP 541 DLP 506 DLP 542 DLP 507 DLP 543 DLP 508 DLP 544 DLP 509 DLP 545 DLP 51...

Страница 152: ......

Страница 153: ...ble NTP an of example an is 2 Figure you that order the in listed steps or items numbered of consists It job a doing for instructions DO the in 1 item with start must you procedure this use To job you...

Страница 154: ...plifiers Channel NTP 009 Only Set Nonkey Capability Station Extended Failure Reported TAP 123 Remove Etc Ringer Horn Alert External NTP 028 Numbers Station Working Two Interchange NTP 081 Correct Ligh...

Страница 155: ...SEB Place 2 DLP 509 Off Line to On Line From System Change Mode On Line in If A Follows as Operation Off Line for System Condition Down Powered If B DLP 503 Minicomputer up Power 1 DLP 503 Printer Lin...

Страница 156: ...is ring write enable the that ensure to how on details the you gives DLP 563 case this In either In DLP 563 to go then 6 Step do cannot you if case this In reel file the on installed cases some In pro...

Страница 157: ...e up empty and reel file Get 1 Set 2 START STOP to switch STOP Set 3 LINE LINE OFF ON to switch LINE OFF Set 4 REL LOAD BR position center to switch tape on written be to data Is 5 If yes go and reel...

Страница 158: ...done provided when philosophy maintenance The Philosophy Maintenance considerations the of overview an gives procedures trouble clearing the into designed instructions step by step Detailed Procedure...