![Look 795 LIGHT RS Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/look/795-light-rs/795-light-rs_manual_1938858030.webp)
EN
28
Installing routing (ctd)
4 / Connect the junction box (JUNCTION – A) and position on the cap (see §
cap assembly
).
5 / Pass through the rear derailleur casing (see
rear break AEROLIGHT electronic version
paragraph
if you have an AEROLIGHT or the
rear brake LIGHT version
paragraph if you have a LIGHT.
6 / Refit the end cap (F) (see
end cap / liner guide
paragraph).
7 / If your bike is a 795 RS AEROLIGHT, pass the front brake liner through opening
①
(Fig.2) (see
fork HSC8 EVO
paragraph).
8 / Pass electric grommet (E) through opening
⑦
(Fig.1).
9 / Thread in the front derailleur electrical cable and take it out through opening
⑩
(Fig.1), then
install the pass liner / electrical cable angle opening (D).
10 / Complete the installation.
WIRELESS electric cable routing configurations E ( AEROLIGHT) and F ( LIGHT)
1 / Remove the derailleur end stop (F)
2 / Pull off the two black mechanical routing liners.
3 / Thread through the rear derailleur casing (see
rear break AEROLIGHT electronic version
paragraph if you have an AEROLIGHT or
rear brake LIGHT version
paragraph for LIGHT).
4 / Refit the end stop (F) (see §
end stop / liner guide
).
5 / If your bike is a 795 RS AEROLIGHT, pass the front brake liner through opening
①
(Fig.2) (see
fork HSC8 EVO
paragraph).
6 / Install the groupset, following the manufacturer’s recommendations.
7 / Locate the Ø7.5 plug (H) in opening
⑦
(Fig.1).
8 / Locate the Ø8 plug (I) in opening
⑩
(Fig.1).
9 / Complete installation.
N.B. :
Before going any further, you must fit the ADH2 handlebar and AEROSTEM stem (see
relevant instructions).
N.B. :
Before going any further, you must fit the ADH2 handlebars and the AEROSTEM stem
(see relevant instructions).
Содержание 795 LIGHT RS
Страница 1: ...MA NUAL...
Страница 24: ......
Страница 44: ......
Страница 64: ......
Страница 84: ......
Страница 104: ...R f 00008718 lookcycle com...