Operating instructions
ScanAfia X TK, S, ICU Version 1.5
Copyright © Lojer Oy, 2015
51
installed on the bed, start installing with Chapter '7.15 Quick mounting frame'.
The stand for the hand-held control is installed on the bed in the following order:
1. Place the quick mounting plate of the hand-held control stand into the
mounting frame as indicated in Figure 100 so that the metal profile of the
quick mounting plate is facing the backrest.
2. Make sure that the locking pin of the mounting frame locks the quick
mounting plate in place.
3. Place the arm of the hand-held control stand into the quick mounting plate
and tighten the thumbscrew of the hand-held control stand with fingers at
the bottom of the quick mounting plate.
1 Quick mounting plate
2 Arm of the hand-held control stand
3 Thumbscrew
Figure 100.
An installed hand-held control stand
7.18
Limb restraint handles (70367)
The ScanAfia X beds have integrated points in the plate stand for the limb
restraints. The limb restraints are used to ensure the safety of a restless patient.
Additional handles for limb restraints to be separately installed on the head end
are available (70367).
IMPORTANT!
Be careful, vigilant and follow the instructions of the limb
restraint manufacturer when using the limb restraints.
IMPORTANT!
We recommend that bed surface adjustments other than the
height adjustment are not used when the patient is in limb
restraints.
7.19
Cushioned rail guard
A cushioned rail guard can be installed on ScanAfia X hospital bed. The guard
prevents legs and arms from getting between the rails. The guard is cushioned
on the inside to prevent the patient from getting hurt against the rails.
1. Pull the rail guard over the rail so that the rail guard opening is in line with
the rail handle (Figure 101).
2
1
3