background image

General Information

MillMaster TOP

www.loepfe.com

7

1

General Information

1.1

About this document

This Instruction Manual helps users to work safely and efficiently with MillMaster TOP.
Read this Instruction Manual in its entirety before starting up MillMaster TOP.
This manual is part of MillMaster TOP and must be kept accessible to trained operators at all times in the
immediate vicinity of the device.

1.2

Scope of application

This document applies to:
The MillMaster TOP software tool.

1.3

Target audience

This document is intended for use by specialist personnel only. The descriptions given here assume that
the reader is a qualified professional trained by the manufacturer. These descriptions do not replace
training on product use.

1.4

Notes

Information symbol

This symbol indicates additional information for the user.

Images in the document

The images of the user interface (screenshots) included in this manual are examples,
and do not necessarily contain relevant data.

Содержание MillMaster TOP

Страница 1: ...Installation Manual MillMaster TOP 46943003_en Original Manual Version 1 0 04 2019...

Страница 2: ......

Страница 3: ...otected by copyright Complete or partial reproduction and dissemination of this Manual to third parties even in form of extracts as well as the use and or disclosure of the contents are not allowed wi...

Страница 4: ......

Страница 5: ...I 20 3 3 5 Schlafhorst Informator AC5 ACX5 AC6 23 3 3 6 Schlafhorst Informator AC338 26 3 3 7 Schlafhorst Informator with series number 7000 26 3 3 8 Schlafhorst Informator with series number 7000 30...

Страница 6: ...Contents 4 1 5 Configure basic group settings 45 4 1 6 Custom reports 46 4 1 7 Add and edit shift calendar 49 4 1 8 Connect and add machines 49 4 1 9 Update software 52 6 www loepfe com MillMaster TOP...

Страница 7: ...ity of the device 1 2 Scope of application This document applies to The MillMaster TOP software tool 1 3 Target audience This document is intended for use by specialist personnel only The descriptions...

Страница 8: ...mation and Warnings Safety information and warnings draw attention to hazards and are marked with symbols and signal words to express the danger level DANGER Indicates an immediate hazardous situation...

Страница 9: ...en Working memory 16 GB RAM Disk storage 500 GB SSD Network connection Ethernet LAN 100 1000 Mbit s Ports USB Uninterruptible power supply UPS recommended Monitor min 24 inches Monitor resolution min...

Страница 10: ...0 Opera 25 0 Network connection Ethernet cable Do not use unshielded UTP cables Cat5e shielded STP Cat6a shielded STP Cat7 shielded STP Length 100 m Switch max 4 Patch cable Cat6a shielded STP Length...

Страница 11: ...TOP www loepfe com 11 3 2 Network topology This section presents examples of network connections To ensure proper and error free network connections only shielded STP cables should be used 3 2 1 Netw...

Страница 12: ...lMaster TOP 3 2 2 Network with multiple IP addresses The machine network and the client network are connected by means of a connection between the two switches A static IP address is required for a co...

Страница 13: ...Installation MillMaster TOP www loepfe com 13 3 2 3 Network via routers The machine network and the client network are connected via routers...

Страница 14: ...fe com MillMaster TOP 3 2 4 Network with VPN The machine network and the client network are connected via VPN through two routers This type of connection is used when two separate networks need to be...

Страница 15: ...in a cable tray or other appropriate device n RJ45 cables are not laid together with cables that carry a live voltage 3 3 1 IP addresses This section provides suggestions and examples of IP addresses...

Страница 16: ...moving device enclosure or opening side panels Use the IP address 192 168 1 200 as the default 1 Connect the client computer to the LAN 2 port with an RJ45 cable The software is now connected to the L...

Страница 17: ...pens 3 Enter username Service and password 4 Press to edit settings 5 Select the Network tab 6 Host Name Enter the hostname e g MA01 7 Select the LAN 2 tab 8 DHCP Select Off 9 IP Address Enter the IP...

Страница 18: ...s window opens 4 Find the MAC address under Reports 5 Find the MAC address in the Central unit menu and compare with the MAC address from Reports If MAC Address 1 matches for example then the LAN 1 po...

Страница 19: ...art service screen to change the IP address The Loepfe YM Zenit monitor service screen window opens 2 Press Change IP Address A confirmation window appears 3 Press Yes to reboot the system The system...

Страница 20: ...has been started up and the menu has been opened 1 Connect an RJ45 cable to LAN 1 to use the software The software is now connected to the LZE II central unit LZE II rear panel Configure network setti...

Страница 21: ...address The Loepfe YM Zenit monitor service screen window opens 2 Press Change IP Address A Disable CF Protection pop up window appears 3 Press Yes to reboot the system The system restarts The SetIpA...

Страница 22: ...Installation 22 www loepfe com MillMaster TOP SetIpAddr2...

Страница 23: ...chine Configuration Machine configuration Management n Software settings n Access permissions n Machine status Login Logout n Enter username and password n Assign password Table 3 Meanings of Informat...

Страница 24: ...ess 4 Enter the password service and confirm 5 Press 6 Scroll to 255 7 Press 8 Scroll to 258 9 Press to reboot the system The system restarts 10 Press the Setup button once the Setup screen opens Ente...

Страница 25: ...TOP www loepfe com 25 Basic Setup Menu 1 Press ESC to switch to the main menu 2 Save changes 3 Press Y The menu closes 4 Press ESC to switch to the main menu 5 Press ESC to reboot the system The syste...

Страница 26: ...connect to the machine Informator units delivered after February 2004 have a built in transceiver 1 Connect an RJ45 cable to the Informator interface to use the software See figure Informator rear pan...

Страница 27: ...severe injury or death 4Unplug the device from mains power before performing any repair or maintenance work 4Unplug the device from mains power before removing device enclosure or opening side panels...

Страница 28: ...hostname are available 1 Select in from the menu to Set internet address 2 Press Enter 3 Enter the prepared TCP IP address e g 192 168 7 101 for Machine 01 Enter subnet mask Prerequisites The Boot me...

Страница 29: ...es The Boot menu is open 1 Select ih from the menu to Set internet hostname 2 Press Enter 3 Enter the hostname e g MA01 Enter Internet broadcast mask Prerequisites The Boot menu is open 1 Select ib fr...

Страница 30: ...ettings 1 Stop the machine 2 Activate the Informator s screen 3 Open the Service Maintenance menu 4 Check the battery level The battery level should be 3000 mV Connect network Prerequisites A software...

Страница 31: ...stname and machine name can be identical 1 In the main menu select Basic Setup Menu 2 Enter the password 42 and confirm 3 Enter the following information from the Informator Informator IP address Subn...

Страница 32: ...Windows Start symbol and right click The Windows menu opens 3 Select Run The Run window opens 4 Enter cmd in the text box 5 Press OK A command line interface window opens 6 At the cursor type ping fol...

Страница 33: ...3 The command line interface window is open 1 At the cursor type ping and the IP address followed by the t flag e g 192 168 7 101 t 2 Press Enter to confirm The ping utility runs The result is shown d...

Страница 34: ...pears at the bottom of the screen Please press DEL or F2 to Enter UEFI BIOS settings 2 Press the DEL or F2 key during the reboot process The UEFI BIOS menu opens 3 Select the Language symbol to open l...

Страница 35: ...n changed 3 5 3 Change network connection properties Prerequisites See System Requirements 9 1 Open Windows Settings Network Internet Network connections Ethernet 2 Open Change adapter options The Con...

Страница 36: ...on 5 Select the radio button for General Use the following IP addresses 6 IP Address Enter the IP address 7 Subnet mask Enter the subnet mask 8 Default gateway Enter the default gateway 9 If both a ma...

Страница 37: ...Installation MillMaster TOP www loepfe com 37 10 Press OK The properties are saved The changes to the network connection properties are complete The server can be added to an existing domain...

Страница 38: ...e 4 MillMaster und LZE versions 3 6 2 Installation Prerequisites The computer is connected to the Internet Anti virus software is turned off during installation The following Microsoft software should...

Страница 39: ...m 39 7 Press Accept 8 Follow the remaining instructions from the wizard When the message Loepfe MillMaster TOP installed successfully appears the installation is complete 9 Close the wizard The Loepfe...

Страница 40: ...name to the server s host file 2 network cards with fixed IP addresses Add both IP addresses and both hostnames to the server s host file Table 5 Install client 1 In Windows Explorer go to Windows Sys...

Страница 41: ...mputerName mminstall in the address bar e g with MMTOPLOEPFE01 for ComputerName 3 Press Enter to confirm The Loepfe MillMaster TOP Client Installation window opens 4 Press Download to start the downlo...

Страница 42: ...or support services opens 3 Enter the requested information in the text boxes using the six digit Customer Number given in the delivery documents 4 Press The Language window opens 5 Select your langua...

Страница 43: ...d 4 1 3 Activate licenses and options This menu can be used to enhance the software with options Prerequisites The Loepfe BDE LicenseGenerator program has been installed The request key is available 1...

Страница 44: ...e active with the associated usernames after initial startup User level Group affiliation Group Role Username Password Permissions Operator operator Operator1 View data Create reports View Trends View...

Страница 45: ...t automatically imported by the software Values Properties Unchangeable n Settings from the central unit are automatically imported by the software n Not displayed when creating a new lot n Central un...

Страница 46: ...ically generated reports by default or configuring custom reports optional feature Automatic generated reports The automatic generated reports are a selection of pre defined reports The individual cus...

Страница 47: ...ectory path wait time and desired reports for example 5 Press The data is saved The changes are recorded Custom reports optional feature The report configuration tool is used to create user defined re...

Страница 48: ...8 www loepfe com MillMaster TOP 2 Press The menu is activated and can be edited 3 Under List reports modify selections e g under Spindles Groups Article Lot etc 4 Press The data is saved The changes a...

Страница 49: ...s n set a maximum of 3 user defined shifts per day n a shift may last up to 12 hours max n time can be set in 15 minute increments Week view Choose the desired distribution n distribute shift cycles o...

Страница 50: ...Operation 50 www loepfe com MillMaster TOP The Settings Connected machines menu opens No data are displayed because no data have been added yet 3 Press The Found machines window opens...

Страница 51: ...hine window opens 5 Enter values in the input fields making sure to fill in the machine parameters and sections 6 Press Add section The machine is connected to the software 7 Check that the desired ma...

Страница 52: ...ware version 3 Download the desired version 4 Double click on the Setup exe file to open it The Loepfe MillMaster TOP Setup window opens with the list of prerequisites 5 Press Next to start the downlo...

Страница 53: ...Loepfe Brothers Ltd 8623 Wetzikon Switzerland Phone 41 43 488 11 11 Fax 41 43 488 11 00 service loepfe com www loepfe com 46943003_en...

Отзывы: