Start-up
(continued)
Check for gas leaks
Before starting the boiler, and during
initial operation, smell near the fl oor and
around the boiler for gas odorant or any
unusual odor. Remove the top access
panel and smell the interior of the boiler
enclosure. Do not proceed with startup
if there is any indication of a gas leak.
Use an approved leak detection solution.
Repair any leaks at once.
DO NOT adjust gas valve outlet pressure.
Th
e gas valve is factory set for the correct
outlet pressure. Th
is setting is suitable
for natural gas and propane, requiring
no fi
eld adjustment. Attempting to
alter the gas valve outlet pressure could
result in damage to the valve, causing
potential severe personal injury, death, or
substantial property damage.
Propane boilers only – Your propane
supplier mixes an odorant with the propane
to make its presence detectable. In some
instances, the odorant can fade, and the
gas may no longer have an odor. Before
startup (and periodically thereaft er), have
the propane supplier verify the correct
odorant level in the gas.
Check thermostat circuit(s)
1. Disconnect the two external wires connected to each
of the heat/loop demand terminals on the connection
board.
2. Connect a voltmeter across these two incoming wires.
Close each thermostat, zone valve, and relay in the
external circuit one at a time and check the voltmeter
reading across the incoming wires.
3. Th
ere should NEVER be a voltage reading.
4. If a voltage does occur under any condition, check and
correct the external wiring. (Th
is is a common problem
when using 3-wire zone valves.)
5. Once the external thermostat circuit wiring is checked
and corrected if necessary, reconnect the external
thermostat circuit wires to the connection board. Allow
the boiler to cycle.
Inspect/fi ll condensate system
Inspect/check condensate lines and fi ttings
1. Inspect the condensate drain line, condensate PVC
fi ttings and condensate trap.
Fill condensate trap with water
1. Remove the PVC cap retaining screw from the PVC cap
(FIG. 10-1).
2. Remove the 2 inch PVC cap with the switch located at the
top of the trap (FIG. 10-1).
3. Fill with fresh water until the water begins to pour out of
the drain.
4. Replace the cap. Press the cap onto the trap until the cap
makes contact with the drain.
5. Replace the retaining screw.
Th
e condensate trap (FIG. 10-1) must be
fi lled with water during all times of boiler
operation to avoid fl ue gas emission from
the condensate drain line. Failure to fi ll
the trap could result in severe personal
injury or death.
Figure 10-1 Condensate Trap