Installation
30
Instruction manual CH
3
is
3.11 Checking the supply
pressure and burner
pressure
Note
Before starting the appliance and/or checking the supply pressure and
burner pressure, you must fill
(5 "Filling")
the appliance.
Caution
Before starting up for the first time or after conversion, you must always
check the supply pressure and burner pressure.
Note
The easiest way to check the gas pressures is by using two pressure
gauges. This procedure assumes that these two gauges are available.
Legend
Unused numbers are not applicable
4.
burner pressure controller
5.
blank plate
6.
supply pressure nipple
7.
gas control
8.
manifold test nipple
9.
sealing screw
10.
burner pressure adjustment
screw
Gas control for CH
Содержание CH 100 CE
Страница 4: ...4 Instruction manual CH gis...
Страница 10: ...Introduction 10 Instruction manual CH 1 gis...
Страница 16: ...Working principle of the water heater 16 Instruction manual CH 2 gis...
Страница 36: ...Conversion to a different gas category 36 Instruction manual CH 4 is...
Страница 44: ...Status of the water heater 44 Instruction manual CH 8 gis...
Страница 46: ...Starting the water heater 46 Instruction manual CH 9 gis...
Страница 48: ...Shutting down 48 Instruction manual CH 10 gis...
Страница 60: ...Electrical diagram 60 Instruction manual CH 14 is 1 brown 2 blue 3 yellow green 4 black 5 white 0305906 R0...
Страница 62: ...Electrical diagram 62 Instruction manual CH 14 is...
Страница 64: ...Declaration of Conformity 64 Instruction manual CH 15 is...
Страница 66: ...0310 570 1 0 UK Index Instruction manual CH...