background image

A

B

C

D

For Cq 1 as follows:
•  Press the ”Reset” button and the button        at the same
 time. 
•  First release the ”Reset” button, followed by the  button
       .
•  Press ”Reset” again.

LK Room Thermostat Cq  

Open the door on the room thermostat and remove the 
transport protection covering the batteries.

Check the mains switch (A) is in the lower position towards
the heat symbol as shown in the picture. During memo-
rizing, the thermostat will attempt to communicate with 
the activated channel on the receiver unit. Memorizing 
can take place before the thermostat is assembled in the 
intended place. The distance between the thermostat
and the receiver should be at least 2 metres during 
memorizing.

NB: Mark the thermostat with the channel number that
it will be sent to. (e.g. with tape on the inside of the door.)

Cq 1 Receiver Unit 

Cq 1 Receiver Unit differs from the other units as up to eight
actuators can be connected.

Up to two actuators can be connected direct to Cq1.
However, if necessary, it is possible to connect up to 
eight actuators to Cq1 by using an external wiring / 
junction box. In both cases the actuators are connected 
parrallel to each other and in line between terminal 9 
and the LK Transformer.

Fig. 3. Circuit diagram Cq 1, (M = Actuator).  

LK Transformer 230/24 V AC  

A transformer 60 VA for 24V AC supply is connected in 
accordance with the circuit diagram for each receiver unit.

  

230V mains voltage connection  

•  Connect the receiver unit and the transformer to the
 mains. 
•  Check the primary and secondary voltage. 
•  Reassemble the protection box on the receiver unit 
  before Memorizing/Start-up.  

MEMORIZING / ACTIVATION - START-UP

Reset

Always begin memorizing by 

Þ

 rst erasing all previous 

programming.  

For Cq 4 and Cq 6 as follows:  
•  Press the ”Reset” button and the button for ”Channel 
  1” at the same time. 
•  First release the ”Reset” button, followed by the  
”Channel 1” button.

N

9

Supply AC 24V
LK Transformer

Mains AC 230V

2

M

M

EN-33.C.14.2-6.0501

!

!

2

Содержание Cq

Страница 1: ...r 1 control zone LK Cq 4 for a maximum of 4 control zones channel 1 4 LK Cq 6 for a maximum of 6 control zones channel 1 6 The receiver unit functions along the same principles but theCq1unit whichonlyhasonereceiverchannel differs somewhat in its design The instructions for this model therefore contain a few additions REQUIREMENTS AsuitablyqualiÞedelectricianorinstallationengineer must carry out e...

Страница 2: ...ght actuators can be connected Up to two actuators can be connected direct to Cq1 However if necessary it is possible to connect up to eight actuators to Cq1 by using an external wiring junction box In both cases the actuators are connected parrallel to each other and in line between terminal 9 and the LK Transformer Fig 3 Circuit diagram Cq 1 M Actuator LK Transformer 230 24 V AC A transformer 60...

Страница 3: ...rds the heat symbol See the section LK Room Thermostat Cq If the setting was right and the problem continues see the section Heat Cool NB During set up only the indicator light on channel 4 or channel 6 comes on when one or more other channels trigger the heating This function continues until all the channels are activated For more informa tion see the section Pump Control ADDITIONAL MEASURES Asse...

Страница 4: ...ess the Reset button and the button for Channel 4 at the same time First release Reset followed by Channel 4 NB FortheCq1unit thechangeismadeontheroom thermostat Alarm Whenafaultoccurs theindicatorlightbeginstoßashwith anirregulartimeintervalandasoundsignalisheard During signaldisruption theaffectedchannelwilldeliverapproxi mately 70 heat output Temporary interruption If no signal is received from...

Страница 5: ... Room Thermostat Controloccursusingpulsewidthmodulation PBM which isintendedforactuators Thecontrolsignal whichiscalcu lated from the difference between the actual temperature and the temperature entered is emitted in the form of a signal with different pulse and rest ratios The sum of the signal and rest period is always 10 minutes With large temperature variations the thermostat is constantly sw...

Страница 6: ...pproximately 3 years Control function PBM optional 2 point Cycle time approximately 10 minutes total on and off time Measurement interval approximately 10 minutes Type Heat Cool Valve exercising Once a day for 3 minutes can be switched off BR1 Temperature sensor NTC Transfer frequency 868 MHz Modulation FM Aerial Intern Transmission interval 10 minutes Range typical 100 metres free air or 2 ßoors ...

Отзывы: